Title Page
-
Barclays - CO2 Replacement Programme 2017
-
Barclays Bank(Branch)
-
Conducted on
-
Prepared by
Branch Details
-
Branch Name
-
Branch Address
-
Branch Manager Name, Contact Telephone Number & Email Address
-
Photos Captured of Front of Branch inc Entrance Door
- Yes
- No
-
Add media
-
Width Dimension of Main Entrance Opening
-
Photo Captured of Branch Name Plate(inc Opening Hours)
- Yes
- No
-
Add media
Existing & New Door Curtain(Internal)
-
Type of Existing Door Curtain inc Make & Model?
-
Photo captured of existing Door Curtain
- Yes
- No
-
Add media
-
Location of Existing Door Curtain Controls
-
Photo capturing existing Door Curtain Controls
- Yes
- No
- n/a
-
Add media
-
Ceiling Height Dimension within Banking Hall/Door Curtain Location
-
Photos taken of surrounding internal areas(Banking Hall) of Branch
- Yes
- No
-
Add media
-
Photos taken of Ceiling Void directly above Door Curtain inc existing support(s)
- Yes
- No
-
Add media
-
Photos taken of likely Pipework Route through the Ceiling Void
- Yes
- No
-
Add media
-
Details of any obvious/likely Builders Work required
-
Details of likely Access Equipment required to reach Ceiling/Ceiling Void & Door Curtain
-
Any other detail noted that could impact any proposed works?
New Door Curtain(External)
-
Details of existing Condenser Location
-
Photos taken of existing Condenser Location
- Yes
- No
-
Add media
-
Details of any existing Acoustic Screens or Enclosures
-
Photos taken of existing Acoustic properties
-
Add media
-
Recommendations of any Acoustic needs
-
Details of Access Restriction to Condenser Location(i.e On Roof, through Alarmed Doors, via Ladders etc)
-
Photos taken of Access Restrictions
- Yes
- No
- n/a
-
Add media
-
Is a Crane Lift likely to be needed?
- Yes
- No
-
Details of likely Crane Lift requirements inc Restrictions
-
Photos taken of likely position of Crane
- Yes
- No
- n/a
-
Add media
-
Details noted of further Access needs or Restrictions
Lighting
-
Detail how many floors the Lighting Replacement works will need to be carried out over(Basement, Ground, 1st etc)
-
Photos taken of all areas of Lighting Replacement
- Yes
- No
-
Add media
-
Confirm Ceiling Heights to works locations
-
Confirm Ceiling Grid/Tile Type & existing Condition
-
Photos taken of existing Ceiling(s)
- Yes
- No
-
Add media
-
Details of likely Access Equipment required to reach Ceiling & Void
-
Are there any works required to take place over or on Staircases?
- Yes
- No
- n/a
-
Is there any requirement for Staircase access equipment?
- Yes
- No
- n/a
-
Photos taken of Staircase(s)
- Yes
- No
- n/a
-
Add media
Other Elements
-
Detail any Parking or Delivery restrictions?
-
Are there any local Residents adjacent, above or in close proximity to the Branch that could create problems?
- Yes
- No
-
Photos taken capturing Residential proximity
- Yes
- No
- n/a
-
Add media
-
Does the Branch have an existing H&S File capturing a current R&D Report?
- Yes
- No
-
Is there sufficient Storage areas to assist with the works?
- Yes
- No
-
Confirm Floor Finishes where Access Equipment may damage(Ceramic Flooring)
-
Is there any spare Paint, Ceiling Tiles or Flooring left within the Branch(relevant to current Finishes within Branch)
- Yes
- No
-
Confirm photos taken of existing Distribution Boards
- Yes
- No
-
Add media
-
Confirm photo taken of existing Electrical Meter
- Yes
- No
-
Add media
-
Add signature