Title Page

  • Barclays - CO2 Replacement Programme 2017

  • Barclays Bank(Branch)

  • Conducted on

  • Prepared by

Branch Details

  • Branch Name

  • Branch Address

  • Branch Manager Name, Contact Telephone Number & Email Address

  • Photos Captured of Front of Branch inc Entrance Door

  • Add media

  • Width Dimension of Main Entrance Opening

  • Photo Captured of Branch Name Plate(inc Opening Hours)

  • Add media

Existing & New Door Curtain(Internal)

  • Type of Existing Door Curtain inc Make & Model?

  • Photo captured of existing Door Curtain

  • Add media

  • Location of Existing Door Curtain Controls

  • Photo capturing existing Door Curtain Controls

  • Add media

  • Ceiling Height Dimension within Banking Hall/Door Curtain Location

  • Photos taken of surrounding internal areas(Banking Hall) of Branch

  • Add media

  • Photos taken of Ceiling Void directly above Door Curtain inc existing support(s)

  • Add media

  • Photos taken of likely Pipework Route through the Ceiling Void

  • Add media

  • Details of any obvious/likely Builders Work required

  • Details of likely Access Equipment required to reach Ceiling/Ceiling Void & Door Curtain

  • Any other detail noted that could impact any proposed works?

New Door Curtain(External)

  • Details of existing Condenser Location

  • Photos taken of existing Condenser Location

  • Add media

  • Details of any existing Acoustic Screens or Enclosures

  • Photos taken of existing Acoustic properties

  • Add media

  • Recommendations of any Acoustic needs

  • Details of Access Restriction to Condenser Location(i.e On Roof, through Alarmed Doors, via Ladders etc)

  • Photos taken of Access Restrictions

  • Add media

  • Is a Crane Lift likely to be needed?

  • Details of likely Crane Lift requirements inc Restrictions

  • Photos taken of likely position of Crane

  • Add media

  • Details noted of further Access needs or Restrictions

Lighting

  • Detail how many floors the Lighting Replacement works will need to be carried out over(Basement, Ground, 1st etc)

  • Photos taken of all areas of Lighting Replacement

  • Add media

  • Confirm Ceiling Heights to works locations

  • Confirm Ceiling Grid/Tile Type & existing Condition

  • Photos taken of existing Ceiling(s)

  • Add media

  • Details of likely Access Equipment required to reach Ceiling & Void

  • Are there any works required to take place over or on Staircases?

  • Is there any requirement for Staircase access equipment?

  • Photos taken of Staircase(s)

  • Add media

Other Elements

  • Detail any Parking or Delivery restrictions?

  • Are there any local Residents adjacent, above or in close proximity to the Branch that could create problems?

  • Photos taken capturing Residential proximity

  • Add media

  • Does the Branch have an existing H&S File capturing a current R&D Report?

  • Is there sufficient Storage areas to assist with the works?

  • Confirm Floor Finishes where Access Equipment may damage(Ceramic Flooring)

  • Is there any spare Paint, Ceiling Tiles or Flooring left within the Branch(relevant to current Finishes within Branch)

  • Confirm photos taken of existing Distribution Boards

  • Add media

  • Confirm photo taken of existing Electrical Meter

  • Add media

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.