Information

  • Barclays

  • Conducted on

  • Prepared by:

  • Location

Pre Survey

Pre-visit

  • Existing Drawings downloaded?<br><br>If no, explain why not

  • Red Line Drawings available?<br><br>If no, explain why not

  • Is there an existing R&D Survey present?<br><br>If No or N/A, explain why

  • Is Asbestos Survey sufficient?<br>(If no, instruct a full R&D Survey)

  • Is CRES Report Available?

  • On Review of CRES is there any specialist contractors needed at ISV?

  • Is there a Structural Survey present?<br><br>If No or N/A, explain why

  • Is BRS Available?

  • Is building listed?

  • Is building in Conservation Area?

Branch Contact Details

Branch Contacts & Details

  • Branch Manager - Contact Name, E-Mail Address and Contact Number:

  • Name:

  • Email Address:

  • Contact Number:

  • Branch Assistant Manager - Contact Name, E-Mail Address and Contact Number:

  • Name:

  • Email Address:

  • Contact Number:

  • Branch Opening Hours:

    (Take picture of Opening Hours sign)

  • Add media

Branch Survey

External Review

  • Photos Taken of Exterior to Branch (All Elevations & Surrounding area)

  • Add media

  • Is there designated customer parking? (List any disable spaces)

  • Add media

  • Is there designated staff parking? (List any disable spaces)

  • Add media

  • Add any key notes to external of branch

Access & Egress

  • Photos Taken of All Entrance Points

  • Add media

  • Capture the type/types of Entrance Doors: (Both external and internal)

  • Door Height Dims:

  • Door Width Dims:

  • Is there DDA access to branch?

  • Add media

  • Add any key notes to Access to branch

Banking Hall

  • Photos Taken of Banking Hall (inc. all existing Self service devices)

  • Add media

  • Required Dimensions Taken

  • Floor To existing ceiling

  • Slab to Slab

  • Critical Dimensions indicated on Redline drawings

  • What is the existing floor construction?

  • Add media

  • Is proposed location of new ASC / QSPs over a basement?

  • Mark up drawing accordingly and attached photo

  • Can any components be retained?

  • List Items that can be retained

Secure Area / Cash Office

  • Photos Taken of Secure Area / Cash Office (inc. all cash drawers etc.)

  • Add media

  • Required Dimensions Taken

  • Floor To existing ceiling

  • Slab to Slab

  • Critical Dimensions indicated on Redline drawings

  • Check "proposed" drawings, are there any services needing moving?

  • Add media

  • Add any key notes / details of non Standard items

  • Add Relevant photos

ATM Room

  • Photos Taken of all areas

  • Photos of ATMs and what they are fitted thru

  • Photos of ATM model number / barcode

  • Add any key notes / details of non Standard items

  • Add Relevant photos

  • Photos of All RSIs

Lifts / Bullion Hoists

  • Is there a Lift / Bullion Hoist present?

  • Sizes of Lifts (list if DDA)

  • Are they operational?

  • Take photos of all Lifts and associated plant

  • Add any key notes / details of non Standard items

  • Add Relevant photos

Basement

  • Is there a basement within the building?

  • Take photos of all areas (inc. strong rooms)

  • Is there any requirement for Structural support below the ASC / QSP resting position?

  • Add media

  • Add any key notes / details of non Standard items

  • Add Relevant photos

First Floor

  • Is there a First Floor within the building?

  • Take photos of all areas

  • Add any key notes / details of non Standard items

  • Add Relevant photos

Second Floor

  • Is there a Second Floor within the building?

  • Take photos of all areas

  • Add any key notes / details of non Standard items

  • Add Relevant photos

Third Floor

  • Is there a Third Floor within the building?

  • Take photos of all areas

  • Add any key notes / details of non Standard items

  • Add Relevant photos

Notes:

  • Capture any other notes relevant to the Project:

  • Add media

Roof

Roof Works

  • Are there any expected works required to Roof

  • List expected requirements

  • Take photos

  • List any additional comments or issues

Exiting IT

I.T

  • Existing IT Equipment Listed (Mark up plans also)

  • General photos taken of all Existing IT

  • OWD quants

  • DCA units

  • CT Units

  • Printers

  • Printers / Fax

  • Take photos of existing comms cabinet

  • General photos taken of all Existing Comms cabinet

  • Add any key notes / details of non Standard items

  • Add Relevant photos

M&E

M&E:

  • Is there a gas boiler heating system present?

  • Is it functional?

  • Take photos of all units, condensers and AHU

  • Has existing Boiler heating system come to end of lift?

  • Add media

  • List M&E comments

  • Capture dis board details and location:

  • Add media

  • Is there an AC System in use? Mark up drawing with approx locations

  • Take photos of all units, condensers and AHU

  • Number of Wall mounted units

  • Number of ceiling mounted units

  • Number of condenser units

  • Has existing AC System come to end of advised lifespan?

  • List M&E comments

  • Is a Acoustic Survey required for new system?

  • Add media

  • List any notes or comments.

CCTV & Security

CCTV & Security

  • Take photos of existing CCTV equipment (inc. cameras and cabinets)

  • Take photos

  • Is sole control in use?

  • Is perimeter alarm present?

  • Take photos

  • Do any window / doors in current secure area have adequate security?

  • Take Photos

  • Are Windows or Doors not currently in secure area now going too in new layout?

  • Take Photos

  • List details

  • Any additional comments

Survey Summary

  • Survey Summary / Notes

  • Signature

  • Date and Time Complete

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.