Information
-
Job Number
-
Conducted on
-
Prepared by
-
Location
-
Weld Number or Station Number
-
Welder(s) PGE Stencil
-
JHA on display, filled out and signed by crew?
-
Hot work Permit on display filled out?
Welding
-
Does the welder(s) have a current weld certs ?
-
Which WPS is being utilized to complete weld?
-
Does WPS match pipe grade, wall thickness and design?
-
Welding Materials
- 200 Degree Temp Stick
- Insulated Stinger
- 3/32 6010 5p
- 1/8 6010 5p
- 5/32 6010 5p
- 1/8 7010 HYP
- 5/32 7010 HYP
- 3/16 7010 HYP
- 4mm 8010
- 5mm 8010
- 3/32 7018
- 1/8 7018
- 5/32 7018
- 3/32 8018
- 1/8 8018
- 5/32 8018
-
Inspector Present?
-
Proper fit up
-
What was the minimum preheat maintained during welding process?
-
Gap O Let Installed?
-
Time between passes acceptable
-
Visually inspected weld to PG&E Standard
-
Weld has less than 1/32'' external undercut
undercut less than 1/32'' greater than 1/64'' for less than 2'' continuous in 12''
NO high spots above 5/32''
NO high spots over 1/8'' for 1'' continuous
NO cold lap
NO Pin Holes
Above flush with pipe -
Welders Stencil Wrote on Pipe
-
Installed Weld Wrap for Inclement weather
-
Does the piece match the drawing
-
Add media