Title Page

  • Site conducted
  • Conducted on

  • Type of works

  • Measure Manager

  • Contractor

  • Supervisor / Operative in charge

HSE Audit

  • Description of Works

  • Name Operatives Undertaking works

  • Name Operatives Undertaking works

  • Name Operatives Undertaking works

  • Name Operatives Undertaking works

Operative Documentation completed

  • Safety folder available

  • Vehicle checks completed weekly

  • First aid Kit checks completed weekly

  • Fire Extinguisher checks completed weekly

  • Spillage Kit Checks completed weekly

  • Ladder Inspection Completed Quarterly

Risk Assessments / Method statement / COSHH

  • Are the relevant Risk assessments available on site

  • Have the relevant Risk assessments been signed by all operatives undertaking works

  • Are the relevant Method statements available on site

  • Have the relevant method statements been signed by all operatives undertaking works

  • Are the Relevant COSHH assessments available on site

  • Have the relevant COSHH assessments been signed by operatives Using

PERMITS

  • Are works being undertaken that would require a permit

  • Has a permit been completed

Competency / ID cards

  • Do all operatives currently hold valid competency for works being undertaken

  • Have all operatives ID cards

Emergency provisions

  • Fire extinguishers available and in 12 month test date

  • First aid kit available and suitable / sufficient

  • Eye wash available and suitable and sufficient

  • First aid trained operative available on site

PPE

  • Is the correct PPE / RPE / PPC being worn

  • Is PPE / RPE / PPC free from damage and defects

LOLER / PUWER

  • Ladders suitable and sufficient and fitted with ladder tags

  • Harnesses and lanyards suitable and sufficient and within 6 month test date

  • Are electrical tool and equipment PAT tested and within date

Environmental

  • Spillage kits available

  • Drains and watercourses

  • Is dust being controlled

  • Are Noise levels being controlled

Working at Hight

  • Are ladders suitable for works being undertaken

  • Are Ladders secured with wall ankers

Scaffolding

  • Is scaffolding installed

  • If scaffold is not in use, is it secured and locked to prevent access

  • Scaffolded tags present and inspected within the last 7 days

  • Is access and egress suitable and sufficient

  • Is the scaffold fitted with sufficient edge protection

  • Is the scaffold free from slips and trips

House keeping

  • Are work areas Clean and tidy

  • Are materials stored to a good house keeping standard

Public Protection

  • Are foot paths and walk ways clear from trip hazards

  • Is the correct public warning signage in place

  • Machinery and vans position to prevent obstructions to the public

  • public protected from the works area

Other H&S issues

  • Other potential health,safety, environment issues during the inspection

Untitled Page

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.