Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Photo of Near Miss
-
Brief Description
-
Contractor Name
-
Was contractor responsive to near miss concerns?
-
What steps will be taken by the contractor to avoid the hazard in the future?
-
Select date
-
Inspector Signature
-
Contractor Signature Contractor acknowledges the near miss and will comply with the step referenced above to avoid this hazard moving forward.