Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
Scope of Works
-
Scope of Works
-
Confirm MPA
-
Confirm Colour
-
Confirm Finish
-
Reinforcing Mesh
-
Decorative Cuts
-
3mm
-
6mm
-
10mm
-
Grouting Required?
-
Are BCP doing any sumps or drainage?
-
Are BCP doing the vehicle crossing?
Pre Site Works Checks
-
Any pre existing damages to be aware of?
-
Area / measurements checked?
-
Falls / Heights checked?
-
Will traffic management be required?
-
Any site hazards to be aware of?
-
Any notes to record
-
Any photos to add