Title Page
-
Site
-
Conducted on
On Site Quality Assurance Check List
-
DATE OF POUR
-
Has the sign in/out book been completed?
-
Weather
-
Has the vibration been completed correctly:
-
Please advise any discrepency's in the vibration of the concrete overall:
-
Please supply pictures of the area of concern:
-
What remediation is required to correct this issue?
-
Are the heights +\~ 5mm?
-
Please advise any discrepency's in the floor levels overall:
-
Please supply pictures of the area of concern:
-
What remediation is required to correct this issue?
-
Add any notes
-
Are all edges / rebates tidy?
-
Please advise any discrepency's in the rebates overall:
-
Please supply pictures of the area of concern:
-
What remediation is required to correct this issue?
-
Add any notes
-
Trowelling around pipes and columns OK
-
Add any notes
-
Has any pump waste been left on site?
-
Are there tools left on site:
-
Notes
Site Tidy Checklist
-
Walls
-
Floors
-
Boxing
-
Kerbs
-
Rubbish free
-
Site swept
-
Add photo
-
Quantity Ordered
-
Quantity Used
-
Please sign off the above information