Title Page
-
Client
-
Site
-
Prepared by
-
Confirm Site
-
What Zone / Area is being inspected?
-
Area of Inspection
- Reo
- Formwork
- Sleeves
- Construction / Expansion Joints
- HD Bolts / Cast In
Formwork Checklist
-
Design checked
-
Position correct
-
Dimensions
-
Alignment
-
Plumbed
-
If cambers are required, are they built in
-
Oiled
-
Chamfers
-
Bracing
-
Meets specified finish
-
She bolts at correct spacing
-
Ties to correct cover
-
Pour ports
-
Wash outs
-
Correct finish levels confirmed
-
Finish levels marked
-
Notes to record
Reo checklist
-
Reo guarantees submitted
-
Diameter of bars
-
Laps length & position
-
Reo detail sheets & drawings
-
Stirrups Quantities, size and spacing
-
Spacing correct
-
Starters
-
Tied rigidly
-
Spacers / chairs
-
Cover Ground / Formwork
-
Engineer inspection booked
-
Rebar clean
-
Work area clean up
-
Have we received Complete Reo PREFAB QA form
-
Have we received Complete Reos ON SITE QA form
-
Notes to record
Sleeves checklist
-
Drain layer
-
Plumber
-
Electrical
-
HVAC
-
Notes to record
Construction and Expansion Joints
-
Location
-
Stability
-
Approved joint system
-
Any notes to record
HD Bolts / Cast In
-
Position
-
Correct grades used accordingly
-
Number
-
Fixing
-
Projection Thread
-
Protection
-
Any notes to record
-
Site photos
-
Client personnel signature
-
BCP personnel signature