Title Page
-
Site conducted
-
Conducted on
-
Inspected by
-
Location
-
Plot
-
Roof Covering
-
Roof Tiler
-
Check the correct lapping distance of the underlay
-
Underlay left short of Apex if ventilated
-
Check battens for gauge and line and correct staggering.
-
Cut ends on the verge treated
-
Check for party wall fire stopping
-
Check Verges, mortar bedded / dry. Fixed to specification
-
Check for wall plate insulation
-
Check for installation of roof ventilation, Over Facia Vent
-
Check specification for tile/slate type and colour
-
Check that tile/slate are fixed in accordance with the manufacturer's guidelines
-
Check that hip tiles fixed correctly
-
Check that ridge tiles are fixed correctly
-
Check that valley tiles are fixed correctly
-
Check the colour and neatness of the mortar work
-
Check the installation of all lead flashings
-
Check for installation of roof vent terminals
-
Check for cleanliness and removal of material debris
Summary & Sign Off
-
Inspected by