Title Page

  • Site conducted

  • Conducted on

  • Inspected by

  • Location
  • Plot

  • Roof Covering

  • Roof Tiler

  • Check the correct lapping distance of the underlay

  • Underlay left short of Apex if ventilated

  • Check battens for gauge and line and correct staggering.

  • Cut ends on the verge treated

  • Check for party wall fire stopping

  • Check Verges, mortar bedded / dry. Fixed to specification

  • Check for wall plate insulation

  • Check for installation of roof ventilation, Over Facia Vent

  • Check specification for tile/slate type and colour

  • Check that tile/slate are fixed in accordance with the manufacturer's guidelines

  • Check that hip tiles fixed correctly

  • Check that ridge tiles are fixed correctly

  • Check that valley tiles are fixed correctly

  • Check the colour and neatness of the mortar work

  • Check the installation of all lead flashings

  • Check for installation of roof vent terminals

  • Check for cleanliness and removal of material debris

Summary & Sign Off

  • Inspected by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.