Title Page
-
Site conducted
-
Conducted on
-
Subcontractor being assessed
-
Assessed by
-
Location
Untitled Page
-
Scope of works of the subcontractor
-
No of personnel in the squad
-
Detail any subcontractor documentation available for the project
- Risk Assessment
- Method Statement
- COSHH Assessment
- Training/Competence Record
- Lift Plan
-
Have all site operatives received a site induction and are records available?
-
Are all squad operatives in possession of a valid CSCS or CSCS affiliated card? (operatives not permitted on site without)
-
Are adequate welfare facilities available for the size of the project?
-
Is there safe access/egress provided to the work area?
-
Is the work area clean and tidy with no risk of slips trips and falls?
-
Are barriers and safety signage erected around the work area if required?
-
Are electrical items PAT tested (including battery charging units)?
-
Are operatives wearing PPE correctly and have signed the issued PPE Register.
-
Are Risk Assessments / Method Statements being adhered to?
-
Have equipment inspection/handover records been supplied i.e Temporary Works handover?
-
Any additional comments including follow up action
Sign Off
-
Assessor