Title Page
-
Site conducted
-
Location
-
Conducted on
-
Inspected by
-
Job Number
-
Area of Project
-
Structural deck handed over
-
Decking clear of debris
-
Profile insulation in place
-
VCL correct material
-
VCL fully adhered
-
VCL side and end laps fully bonded
-
Hold Point (client signature required)
-
160mm insulation fully bonded
-
No gaps between boards
-
Hold Point (client signature required)
-
150mm insulation fully bonded
-
150mm insulation break bonded
-
No gaps between boards
-
Hold Point (client signature required)
-
Single ply correct Material
-
Single ply fully bonded
-
Side and end laps welded
Summary and Sign Off
-
Summary of findings
-
Inspector Sign Off
-
Client Inspection