Title Page

  • Site conducted

  • Location
  • Conducted on

  • Inspected by

  • Job Number

  • Area of Project

  • Structural deck handed over

  • Decking clear of debris

  • Profile insulation in place

  • VCL correct material

  • VCL fully adhered

  • VCL side and end laps fully bonded

  • Hold Point (client signature required)

  • 160mm insulation fully bonded

  • No gaps between boards

  • Hold Point (client signature required)

  • 150mm insulation fully bonded

  • 150mm insulation break bonded

  • No gaps between boards

  • Hold Point (client signature required)

  • Single ply correct Material

  • Single ply fully bonded

  • Side and end laps welded

Summary and Sign Off

  • Summary of findings

  • Inspector Sign Off

  • Client Inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.