Title Page

  • Site conducted

  • Location
  • Conducted on

  • Inspected by

  • Job Number

  • Area of Project

Inspection

  • Structural steel handed over

  • Correct decking material

  • 2 Fixings per corrie per beam

  • Side laps stitched at 500mm ctrs

  • Butyl tape to side laps

  • Butyl tape to end laps

  • Decking brushed free of debris

Summary and Sign Off

  • Summary of Findings

  • Inspector Sign Off

  • Client Inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.