Title Page
-
Conducted on
-
Prepared by
-
Location
-
Client -
Works Inspected
-
Type of Scaffold
-
Take Photo of scaffold
-
Type Of Site
-
single storey
-
2 storey
-
shade cloth
-
stair access
-
3rd deck
-
ladder beam
-
balcony scaffold
Quality Audit
-
Are all sole boards on firm level ground
-
Are jacks on sole boards
-
Are all standards in line and plumb to the building structure
-
Have all Hop Outs been installed
-
Are all face and end braces fitted to code
-
Has all edge protection been fitted (toeboards, brickguards, handrails)
-
Type of edge protection fitted
-
All gaps covered and lap planks secured
-
Have adequate ties been fitted to each side ( min 2 per elevation)
-
Details of access provided
-
Has handover /Scaff tag been attached to scaffold at access point
-
Handover / Scaff tag photo
Inspection Notes / Photos
-
Are there any signs of damage to the building by scaffolders or others
-
Description of scaffold state upon arrival
-
Photo of Damage
Photos Of Scaffold
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
Rectification Works
-
Any Rectification works required
-
List details of rectification work
Extra gear Onsite
-
Is beam Scaffold still in use
-
Is pickup of leftovers required
-
Is Fascia/Gutter gear on site
Sign Off
-
Inspection Passed
-
EAH Inspector Signature
-
Name of Client
-