Title Page

  • Site conducted

  • Inspection Report Number

  • Points Total
  • NSI Grade (A_E)

  • Name and Address of Installation

Untitled Page

Documentation

  • A1-A3, A5 - Risk Assessment

  • A4 - Required methods to release access points in the event of emergency.

  • A6 - Updates & firmware

  • A7 - Customer permission

  • A8 - External device updates

  • A9 - Retaining details

  • A10 - Logbooks / Records

  • A11 - DPA & GDPR

  • A12 - NSI Certificate

  • A13 - Remote management

  • A14 - System design proposal

  • A15 - Maintenance contract

  • A16 - As-fitted documentation

Handover & Training

  • B1-B3 - Rating & Protection

Equipment Selection

  • C1 - System components

  • C2 - Control equipment

  • C3 - Physical strength

  • C4 - Release times

  • C5 - Class level

Safety Requirements

  • D1 - Means of release BS7273-4

  • D2 - Building/Fire safety regulations

  • D3 - Safe egress

  • D4 - Override trigger

  • D5 - Equipment housing labels

  • D6 - Fire door evidence guidance

  • D7 - Cable 'Critical Signal Path' BS7273-4

Security Requirements

  • E1-E3 - Access points

  • E4 - Control equipment secure location

  • E5 - Control equipment tamper

  • E6 - Access point configuration visible externally

  • E7-E8 - Access permissions

  • E9 - Token authorisation

  • E10 - Class 2^ Open/Closed Detection

  • E11 - Class ^4 comms not monitored

  • E12 - Class 2^ access point no tool required

  • E13 - Biometric adjustments

  • E14 - Additional PSU security

  • E15 - Network security

  • E16 - Unused user accounts

  • E17 - RFID reads the chip S/N

  • E18 - Access control power recovery

  • E19 - Access point security on comms failure/Restoral

  • E20 - Failure of comms prevents access point operation

Environmental Protection

  • F1-F4 - Equipment housing & environmental

Cable Installation

  • G1 - supporting electrical loads

  • G2 - Mechanical protection

  • G3 - Extra low voltage cable joints

  • G4 - Extra low voltage cable segregation

  • G5 - Wiring not adequately supported

  • G6 - Data cable electrical load & transmission rate

  • G7 - UTP test results

  • G8 - Data cable levelling

  • G9 - ELV/LV cables are sufficient

Reader Functions & Indications

  • H1 - Access granted/denied indication at AP

  • H2 - Central indications & annunciations

  • H3 - Visual / Audiable indications are distinguishable

Access Point Hardware

  • J1 - Access point hardware performance & functionality

  • J2 - Manual release control distinguishable

  • J3 - Closing devices

  • J4 - Access point mounting

  • J5-J6 - Access point location

Power Supplies

  • K1 - PSU load

  • K2 - Manufacturer recommendations

  • K3 - PSU location

  • K4 - PSU supply spur

  • K5 - Power cable segregation

  • K6 - UPS capacity

Maintenance

  • L1 - Company compatability

  • L2 - Tools & equipment

  • L3-L6 - Evidence & history of maintenance

  • L7 - Maintenance facility

  • L8-L10 - Records

Closing

  • If part of the installation has not been checked, please give an explanation in the space below.

Audit Completion

  • Engineer Signature

  • Date

  • Auditor Signature

  • Date

  • Location
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.