Title Page
-
Site conducted
-
Inspection Report Number
-
Points Total
-
NSI Grade (A_E)
-
Name and Address of Installation
Untitled Page
Documentation
-
A1-A3, A5 - Risk Assessment
-
A4 - Required methods to release access points in the event of emergency.
-
A6 - Updates & firmware
-
A7 - Customer permission
-
A8 - External device updates
-
A9 - Retaining details
-
A10 - Logbooks / Records
-
A11 - DPA & GDPR
-
A12 - NSI Certificate
-
A13 - Remote management
-
A14 - System design proposal
-
A15 - Maintenance contract
-
A16 - As-fitted documentation
Handover & Training
-
B1-B3 - Rating & Protection
Equipment Selection
-
C1 - System components
-
C2 - Control equipment
-
C3 - Physical strength
-
C4 - Release times
-
C5 - Class level
Safety Requirements
-
D1 - Means of release BS7273-4
-
D2 - Building/Fire safety regulations
-
D3 - Safe egress
-
D4 - Override trigger
-
D5 - Equipment housing labels
-
D6 - Fire door evidence guidance
-
D7 - Cable 'Critical Signal Path' BS7273-4
Security Requirements
-
E1-E3 - Access points
-
E4 - Control equipment secure location
-
E5 - Control equipment tamper
-
E6 - Access point configuration visible externally
-
E7-E8 - Access permissions
-
E9 - Token authorisation
-
E10 - Class 2^ Open/Closed Detection
-
E11 - Class ^4 comms not monitored
-
E12 - Class 2^ access point no tool required
-
E13 - Biometric adjustments
-
E14 - Additional PSU security
-
E15 - Network security
-
E16 - Unused user accounts
-
E17 - RFID reads the chip S/N
-
E18 - Access control power recovery
-
E19 - Access point security on comms failure/Restoral
-
E20 - Failure of comms prevents access point operation
Environmental Protection
-
F1-F4 - Equipment housing & environmental
Cable Installation
-
G1 - supporting electrical loads
-
G2 - Mechanical protection
-
G3 - Extra low voltage cable joints
-
G4 - Extra low voltage cable segregation
-
G5 - Wiring not adequately supported
-
G6 - Data cable electrical load & transmission rate
-
G7 - UTP test results
-
G8 - Data cable levelling
-
G9 - ELV/LV cables are sufficient
Reader Functions & Indications
-
H1 - Access granted/denied indication at AP
-
H2 - Central indications & annunciations
-
H3 - Visual / Audiable indications are distinguishable
Access Point Hardware
-
J1 - Access point hardware performance & functionality
-
J2 - Manual release control distinguishable
-
J3 - Closing devices
-
J4 - Access point mounting
-
J5-J6 - Access point location
Power Supplies
-
K1 - PSU load
-
K2 - Manufacturer recommendations
-
K3 - PSU location
-
K4 - PSU supply spur
-
K5 - Power cable segregation
-
K6 - UPS capacity
Maintenance
-
L1 - Company compatability
-
L2 - Tools & equipment
-
L3-L6 - Evidence & history of maintenance
-
L7 - Maintenance facility
-
L8-L10 - Records
Closing
-
If part of the installation has not been checked, please give an explanation in the space below.
Audit Completion
-
Engineer Signature
-
Date
-
Auditor Signature
-
Date
-