Title Page
-
Site conducted
-
Inspection Report Number
-
Points Total
-
NSI Grade (A_E)
-
Name and Address of Installation
Untitled Page
Documentation - Site Survey, Risk Assessment & User Requirement
-
A1 - Risk assessment
-
B1 - Site Survey
-
C1 - User requirement
Documentation
-
D1-D5 - Documentation
-
D6-D11 - Imaging & Sensing
-
D12-D15 - Video & Audio
-
D16-D18 - Data handling
-
D19-D22 - Networks
-
D23-D25 - Ancillaries
-
D25-D30 - Operations
-
E1 - Installation
-
F1-F4 - Test plan
-
G1-G6 - Commissioning & Handover
System Inspection
-
H1-H8 - Imaging & Sensing
-
J1-J4 - Video & Audio
-
L1-L4 - Networks
-
M1-M5 - Ancillaries
-
N1-N2 - Operations
-
P1-P9 - Installation
Closing
-
Add comments to describe deviations or observations on documentation or inspection. If part of the installation has not been checked, please give an explanation in the section below.
Audit Completion
-
Engineer Signature
-
Date
-
Auditor Signature
-
Date
-
Location