Title Page

  • Conducted on

  • Prepared by

  • Location
  • Project Name

Bolt Trace Details

  • Confirm name of Installer?

  • Bolt Manufacturer

  • Bolt Grade

  • Bolt Size/Dimensions

  • Batch # (Include photo of original packaging cert)

  • Structural Connection (Include Photo)

  • Connection Type (I.e PFC to UB)

Inspection Checklist

  • Correct bolt type and grade used

  • Correct bolt size and length

  • Batch number and grade recorded

  • Bolt head markings verified

  • Proper alignment of bolts

  • Use of washers as specified

Sign-Off

  • Name of Inspector

  • Date

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.