Information
-
Document No.
-
Audit Title: Apartment Inspection
-
Plot
-
Block
- Block A
- Block B
- Block C
- Block D
- D town house
- B town house
- 5 story town house
-
Level
- Ground Floor
- level 1
- level 2
- level 3
- level 4
- level 5
- level 6
- level 7
- level 8
- level 9
- level 10
-
Apartment Reference:
-
Conducted for:
-
Conducted on
-
Inspected by:
-
General Comments:
-
Drawing Ref:
-
Drawing:
General Items:
-
District Heating Available?
-
Hot Water Available from HIU?
Services:
General:
-
Doorbell push button Installed?
-
Doorbell works?
-
SVP and District Heating Earth Bonding complete, labeled and continuous?
-
SVP Rodding Eyes fixed and in position?
-
Inspected by:
Lights:
-
Two way operation operates correctly?
-
Switches turn on / off correctly?
-
Kitchen / Living Room Light Switch sequence correct?
-
All light fittings and lamps installed?
Sockets:
-
Sockets & Outlets level and fixed securely?
-
Socket outlets work?
-
Socket switches operate correctly?
Smoke detectors:
-
Smoke Detectors operate correct when powered?
-
Smoke Detectors operate correctly on battery?
-
Smoke Detectors fitted correctly?
Heating
-
TRV`s installed where required?
-
Wheelhead valves installed on Radiators that do not require a TRV?
-
Rubber grommets installed on pipework to radiators (Where required)?
-
Correct number of Thermostats installed?
-
Time Clock installed and time set?
-
Controls work (Thermostats and Time Clock)?
MVHR (Whole House Ventilation):
-
MVHR Supply and Extract Works (Tissue Test)?
-
MVHR Boost Works on Bathroom Light Switch?
-
MVHR Boost works on Cloakroom Light Switch?
-
MVHR Filters Clean?
HIU Cupboard:
-
Consumer Unit is complete and working?
-
Consumer Unit Label is fitted and tidy / neat?
-
Electrical accessories level and Installed correctly?
-
Isolation Switches work?
-
Trace Heating (Heat Tape) works and is on?
-
Trace Heating Labelling complete?
-
AIU fused spur is powered and operational?
-
Cupboard Light works and timer is set to a reasonable time?
-
Washing Machine Socket works?
-
Correct fuses installed in all spurs (13A in Trace Heating, 3A in all others)
-
Pipework lagging complete?
-
Labelling complete to pipework (i.e. Stopcock Label)?
-
Isolation valves operate correctly?
-
Inspected by:
Kitchen:
-
Hot Tap works?
-
Cold Tap works?
-
Water is Hot and Cold as shown on the Tap?
-
Mixer works?
-
Plug installed and works?
-
Overflow works?
-
Stopcocks work and labelled correctly?
-
Oven Switch installed correctly and Neon illuminates?
-
Cooker Hood Powered / Works?
-
Isolation Switches work?
-
Inspected by:
Bathroom:
Bath:
-
Bath Taps Hot / Cold / Mixer work?
-
Water is Hot / Cold as indicated on the tap?
-
Overflow works?
-
Plug installed and works?
-
Shower works (No Leaks)?
-
No risk of Shower Back Siphonage?
Wash Hand Basin:
-
Basin Taps Hot / Cold / Mixer work?
-
Water is Hot / Cold as indicated on the taps?
-
Hot Tap installed on the left - Cold Tap on the right?
-
Plug is installed and works?
-
Overflow works?
Toilet:
-
No hot flushes?
-
Overflow works - No Leaks?
-
Long flush works and refills within a reasonable time?
-
Short flush works and refills within a reasonable time?
-
Seat is fitted, stable and stays up?
Room Generally
-
Lights Work?
-
Electric towel Rail works?
-
Towel Rail Heats up?
-
Shaver Socket works?
-
Bath / Basin / Toilet Manifold Valves labeled correctly?
-
Inspected by:
Cloakroom:
Wash Hand Basin:
-
Basin taps Hot / Cold / Mixer Taps work?
-
Water is Hot / Cold as indicated on the Taps?
-
Hot Tap installed on the left - Cold Tap on the right?
-
Plug is installed and works?
-
Overflow works?
Toilet:
-
No hot flushes?
-
Overflow works (No leaks)?
-
Long flush works and refills in a reasonable time?
-
Short flush works and refills in a reasonable time?
-
Seat is fitted, stable and stays up?
Room generally:
-
Lights work?
-
Towel rail works?
-
Towel rail heats up?
-
Shaver socket works?
-
Basin / Toilet Manifold Vales labeled correctly?
-
Inspected by:
-
Inspection by B&C Manager / Supervisor: