Title Page
-
Site conducted
-
Conducted on
-
Inspection by
-
Contractor name
-
Breaker should be in good and working condition
-
Power cable should be free from damages and connection taken through industrial plug.
-
A flexible cord should be provided to keep cable free from damage.
-
Handle should be provided for better control.
-
Bit should be in good condition and free from defect.
-
Breaker should be double insulated otherwise grounded.<br>
-
Machine operated by competent person.
Conclusion
-
Is equipment safe and accept for use