Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Bridge #
-
Select date
-
Photo 1 - Upstream Face
-
Photo 2 - Downstream Face
-
Photo 3 - Approach From North/West
-
Photo 4 - Approach From South/East
-
Photo 5 -
-
Photo 6 -
BRIDGE ENDS
-
Bridge Open/Posted/Closed
-
Posting Signs Required?
-
Posting Signs in Place?
-
Bridge Rail (36a)
-
Rail Transition (36b)
-
Approach G'Rail (36c)
-
Guard Rail Ends (36d)
-
Bridge End General Comments:
-
Additional Photo If Necessary
-
Additional Photo If Necessary
-
Additional Photo If Necessary
-
Additional Photo If Necessary
DECK
-
Joint Condition
-
Drain Condition
-
Rail Condition
-
Sidewalk Condition
-
Live Load Deflection/Vibration
-
Debris Accumulation on Deck
-
Overall Deck Condition
-
Deck General Comments
-
Additional Photo If Necessary
-
Additional Photo If Necessary
-
Additional Photo If Necessary
-
Additional Photo If Necessary
SUPERSTRUCTURE
-
Girders
-
Diaphragms
-
Stringers
-
Floor Beams
-
Sway Bracing
-
Hangers
-
Paint
-
Cap/Girder Debris
-
Collision Damage
-
Have Flood Waters Reached Superstructure?
-
General Super Structure Comments
-
Additional Photo If Necessary
-
Additional Photo If Necessary
-
Additional Photo If Necessary
-
Additional Photo If Necessary
SUBSTRUCTURE
Abutments
-
Bearings
-
Cap
-
Piling Foundations
-
Pile Type
-
Back Wall
-
Embankment
-
Slope Protection
-
Scour
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
Intermediate Bents
-
Bearings
-
Cap
-
Piles/Columns
-
Pile Type
-
Footings
-
Web Walls
-
Bracing
-
Scour
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Underwater Inspection Req'd?
-
General Substructure Comments
Scour/Waterway Appraisal
-
Scour Critical (113)
- N-Bridge Not Over Water
- 9-All Piling on Dry Land
- 8-Br. Stable w/ Scour Above Top of Footing
- 7-Countermeasures Installed
- 6-Not Calc/Assessed
- 5-Br. Stable w/ Scour Within Limits of Footing
- 4-Action Req'd, Exposed Foundation
- 3-Scour Critical, Below Footing
- 2-Extensive Scour
- 1-Failure Imminent
- 0-Bridge Failed
-
Scour Indicator Notes: (Describe scour condition)
-
Scour Countermeasures in Place?
-
Debris/Drift Upstream?
-
Debris/Drift Site?
-
Debris/Drift Downstream?
-
Overall Channel Condition
-
Indications that High Waters Overtop Structure and/or Approach Roadway?
-
Route Functional Classification (26)
- 1-Rural Principal Arterial Interstate
- 2-Princ. Art. Other
- 6-Rural Mnr Art.
- 7-Rural Mjr Collector
- 8-Rural Mnr Collector
- 9-Rural Local
- 11-Urban Princ. Art Interstate
- 12-Urban Princ. Art Freeway
- 14-Urban Princ. Other
- 16-Urban Mnr Arterial
- 17-Urban Collector
- 19-Urban Local
-
General Waterway/Scour Comments:
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
Inspection Team Summary
-
General Notes
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Additional Photo if Necessary
-
Team Leader