Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Bridge #
-
Select date
-
Photo 1 - Upstream Face
-
Photo 2 - Downstream Face
-
Photo 3 - Approach From North/West
-
Photo 4 - Approach From South/East
ROADWAY
-
Are any signs missing, damaged or obscured
-
Is the ID marker missing, damaged or obscured
-
Is there any damage to guardrail including end terminals<br>
-
Is there any damage to delineators
-
Is the road side drainage outfall to waterway blocked, scoured or eroded
-
Have the road approaches settled or depressed
-
Have the road approaches got visible crocodile cracking or potholes
STRUCTURE
PEIRS
-
Is there cracking on the peirs
-
Is there exposed reinforcement on the peirs
-
Is there erosion around the base of the peirs
ABUTMENTS
-
Is there cracking evident on abutments
-
Is there identifiable movement at the abutments
-
Is there erosion and scour evident around the abutments
BEAMS
-
Is there cracking evident on the beams
-
Is there exposed reinforcement on beams
-
Is there separation between the bearings and abutment
-
Is there rust or decay of the beams
BEARINGS AND EXPANSION JOINTS
-
Are bearings damaged or displaced
-
Are the expansion joints damaged or displaced
-
Is there separation between the bearings and abutments
-
Are all bolts and fixings in place and secure
WATERWAY
-
Is there debris built up on upstream side of structure
-
Is there erosion and scour evident in the waterway bed
-
Is there erosion and scour evident in waterway embankment
-
Is there vegetation causing damage to structure or obstructing the waterway
Inspection Team Summary
-
General Notes
-
Is a further level 2 inspection required
-
Add signature