Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

DETAILS

  • Structure ID

  • Crossing

  • Structure Type

  • Construction Type

  • Construction Material

  • Bridge Name

  • Road Number

  • Road Name

  • Owner

  • District

  • Local Authority

  • Inspector

  • Permanent Standing Water

  • Inspection Reason

  • Date of inspection

  • Date of next inspection

  • Chainage (km)

  • on the...

  • to ......... Road

INSPECTION ELEMENTS

  • Approaches

  • 1. Signs and Delineation

  • Missing damaged obscured (includes ID plate)

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 2. Guardrail

  • Accidental damage

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Incorrect alignment

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Connection to Bridge

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Delineators

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 3. Road Drainage

  • Blocked inlets/outlets

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Scour of outlets/embankment

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 4. Road Surface

  • Material Defects * - concrete

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Material defects* - surfacing

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Settlement, depressions

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Rough joint transition

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 5. Bridge Surface

  • Material Defects * - concrete

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Material defects* - surfacing

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Material defects* - timber

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Scuppers

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 6. Footpath

  • Clean

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Even

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 7. Barriers

  • Impact Damage

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Loose/damaged fixings

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Loose post base

  • Rectified

  • Maintenance Required

  • Material Defects *

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Delineators

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 8. Expansion Joints

  • Loose/damaged fixings

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Damaged/missing seals

  • Rectified

  • Maintenance Required

  • Deck/nosing/ballast wall damage

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Obstructions in gap

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Waterway

  • 9. General

  • Trees or bushes under bridge

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Debris against structure

  • Rectified

  • Maintenance Required

  • Riverbank/Embankment erosion

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Scour holes in bed

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Damaged bed protection

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Substructure (including culvert wingwalls)

  • 10. Material Defect

  • Piles

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Footings

  • Rectified

  • Maintenance Required

  • Walls/Stems

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Headstocks

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 11. General

  • Forward movement of abutments/wings

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Blocked drains/weepholes

  • Rectified

  • Maintenance Required

  • Debris on shelf/bearing

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Scour/erosion of spillthrough

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Dampness/leakage from deck

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Substructure protection (over-bridges)

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 12. Bearings

  • Gap closed/decks in contact/damaged

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Bearing displaced/damaged

  • Rectified

  • Maintenance Required

  • Poorly seated

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Corroded/Seized/No lubricant

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Superstructure

  • 13. Material defects* in:

  • Girders (including fasteners)

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Cross Girders

  • Rectified

  • Maintenance Required

  • Deck

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Coatings

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 14. General

  • Debris/dirt build-up

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Impact damage

  • Rectified

  • Maintenance Required

  • Excessive movement/vibration

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Dampness

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Ventholes

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Miscellaneous

  • 15. Damage to services

  • Fasteners/Brackets

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Pipe/Conduit

  • Rectified

  • Maintenance Required

  • Openings

  • Rectified

  • Maintenance Required

  • Inspection Required

  • 16. Roadway under bridge

  • Delineation

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Barriers

  • Rectified

  • Maintenance Required

  • Road drainage

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Culverts

  • 17. Material Defects* in:

  • Walls

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Walls

  • Rectified

  • Maintenance Required

  • Aprons

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Wingwalls/Headwalls

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Steel Culverts **

  • Rectified

  • Maintenance Required

  • Inspection Required

  • Material and Defects Description
    Concrete - Cracking, spalling, corrosion of reinforcement, dummy areas
    Steel - Bending, buckling, cracking, distortion, loose bolts, rivets, corrosion, coating damage
    Timber - Splitting, crushing, decay, infestation, loose bolts or pins
    Masonry - Cracking, opening joints, mortar loss, bulging
    Bituminous Surfacing - Cracking, crazing, breaking up, lifting off, rutting, pushing
    Protective Coating - Cracked, peeling, weathered

    ** Steel Culverts - probe or sound culvert walls at normal water level, checking for pitting or loss of culvert material.

Photos and Sketches Record

    Photographs
  • Description

  • Add media

  • Sketches
  • Description

  • Add drawing

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.