Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
BRM/HSQE-INSPECTION/HSQE01
-
Person carrying out inspection:
-
Date of Inspection:
-
Contract Name:
-
Report No:
-
Key Staff Seen:
-
Location of
Inspection
-
Brief description of work/area being inspected:
-
Detail of any other contractors involved with above:
-
Names of operatives engaged with during inspection:
-
Description of any plant checked during inspection:
Section 1 General Safety, Health and Wellbeing
-
Are you satisfied that all BRM personnel have undergone the main site Safety Induction?
-
Are you satisfied that operatives have the correct and also sufficient task RAMS?
-
Are you satisfied that an appropriate BRM Point of Work Risk Assessment has been completed and relevant personnel briefed?
-
Are you satisfied that if excavating all available utility drawings are at the point of work?
-
Are you satisfied that a sufficient Permit to Dig has been completed?
-
Are you satisfied that all excavations / trenches are appropriately supported and signed / guarded to prevent unauthorised access?
-
Are you satisfied that there are the correct construction drawings on site?
-
Lifting - Are you satisfied that lifting equipment used on the activity is tested and valid certificates are on site?
-
HAVS - Are you satisfied that if vibrating tools are being used, such as breakers, drills (including hired equipment) etc are being controlled and monitored?
-
Plant – Are you satisfied that all plant being used on site is of an acceptable standard?
-
Plant – Are you satisfied that all plant being used on site has been inspected before use?
-
Welfare - Are you satisfied that the provided welfare facilities are sufficient, clean, tidy
-
Are you satisfied that the working area is tidy (no rubbish, trip/fall hazards, waste removed etc)?
-
Are you satisfied that where manual handling is an issue, a specific manual handling risk assessment has been carried out?
-
Are you satisfied that operatives undertaking the activity have had adequate manual handling training?
-
Are you satisfied that first aid kits are available on site and they are complete?
-
Are you satisfied that there are an adequate number of appointed first aiders for the work area and operatives know who they are and how to contact them?
-
Are you satisfied that all personnel have the correct PPE for the work they are
-
Are you satisfied that adequate fire fighting equipment is available on site?
-
Are you satisfied that suitable and sufficient handrail is located around open excavations?
-
If operatives are entering deep excavations are you satisfied that the sides are suitably supported, battered or stepped and inspection records have been completed?
Section 2 Traffic Management/ NRSWA (Chapter 8)
-
Are you satisfied that hazard warning beacons are working on vehicles involved.
-
Are you satisfied that advance warning signs are set out correctly & are in good order?
-
Are you satisfied that cones are set out correctly & are in good order?
-
If temporary traffic lights used are they in good order and suitably located?
-
Is a safety zone set up around the work area (physical barrier)?
-
Is Works Access & Egress clearly visible?
-
If cone lights are fitted do they work?
-
Does the Traffic Management provide a safe route for pedestrians and public vehicles?
-
Have daily vehicle inspections been carried out and recorded?
-
Has a suitable risk assessment been carried out for the use of plant?
Human Behaviours
-
Do all operatives understand the Behavioural Safety requirements?
-
Do all operatives consider others safety whilst working?
-
Have you personally checked that operators have got their valid cards SWQR Cards, NPORS, SMART Awards, CSCS/EUSR, PIA etc?
-
Do operatives believe that safety is their responsibility?
-
Do operatives challenge unsafe behavior's?
Environmental
-
Are you satisfied that COSHH assessments are available for all substances used in undertaking?
-
Are containers holding hazardous liquid bunded to 110% capacity?
-
Is fuel stored in correct fuel containers?
-
Are controls in place for dust suppression? Is mud on roads being controlled?
-
Is noise nuisance being controlled?
-
Are all substance containers correctly labelled?
-
Are drip trays in use for Static Equipment i.e. generators?
-
Are emergency spill kits available on site?
-
If you are working adjacent to a watercourse are suitable precautions in place?
-
Are you satisfied that work is being completed in accordance with the client’s specification?
-
Are you satisfied that work is being completed in accordance with the NJUG Guidelines for the Planning, Installation and Maintenance of Utility Apparatus in Proximity to Trees?
-
Have you checked that all testing & measuring equipment has got current calibration dates attached on site?
-
Is appropriate care being given to avoid damage to 3rd party property?
-
Insert any Additional Items Inspected
Legislation
-
Do any of the issues raised in the above questions give rise to any possible breaches of Health and Safety at Work at 1974?
-
Do any of the issues raised in the above questions give rise to any possible breach of Safety, Health and Wellbeing of BRM policies and procedures?
Actions
-
Actions to be taken:
-
Due date: (Immediate, 1 week, 2 weeks)
-
Person:
-
Reports to:
Sign Off
-
Inspection Undertaken By:
-
SIGNATURE:
-
DATE:
Distribution
-
Distributed to: