Information
-
Document No.
-
Contractor Name
- WELCH CIVILS
- BOUYANT
- EDEN
- MS3
- T1
-
Date and Time
-
Name of person completing this report
-
Location
-
OLT AREA (I.E SCN101)
General
-
Supervisor / Foreman at time of this inspection (if present)
Quality Audit
GENERIC AUDIT CHECKS (UG/OH/CIVILS)
-
Any cut cable ties (straps cable fixing) cut flush with no sharp edges. (CP10 S.3.5.4)
-
Any observed safety defects reported (A1024) (S.17)
-
Hazardous fibre waste (Sharps/Shards) cleared from site
-
Apparatus legibly labelled as per Reference Offer Spec (S.6, CP10 S.4)
-
Apparatus legibly labelled (Minor Defect) (S.6, CP10 S.4)
-
Cables routed through underground structure/on pole in a manner which will obstruct access to existing apparatus (CP8 s.21, CP10 s.3)
Overhead Specific Audit Checks
-
Apparatus fitted within correct envelope of space (CP8 s5, s.20)
-
Pole mounted apparatus securely fixed to the pole (CP8 s.5 s.21)
-
Upper Bass Step correctly repositioned and is compliant with step shift specification (CP17)
-
Are the plugs creosote inserted into the existing holes created by the removal of the coach screws (CP17)
-
Cables securely fixed at specified intervals and routed away from climbing steps, any coils managed in approved device. (CP8 s.3.4, s.20)
-
Cable(s) attached to pole top using spiral/wedge clamp (CP8 s3.1)
-
Use of aerial cable approved (CP8 s.2.2 & 2.3)
-
Newly provided OH cables compliant with minimum height requirements (CP8 s.9)
-
Any existing wires/cables below 5.2m reported (CP8 s.10, PD)
-
Newly provided OH cables, correct power separation distances maintained (CP8 s.12)
-
Pole capping replaced/provided where CP cables shares existing duct (CP8 s.3.4)
-
Overhead cable loadings not exceeded (DILOR) (CP8 s7)
Civils Specific Audit Checks
-
Internal duct seal correctly sealed to prevent ingress of water and gas following PIA cabling
-
No Excessive PIA cabling left within underground structure (CP10 s.6)
-
Cables correctly supported and restrained (CP10 s.3)
-
High security equipment/covers/locks replaced following cable/jointing work
-
Duct blockage correctly cleared (CP13 s.5)
-
Cables & equipment adequately protected for duration of works (CP13 s.6)
-
Cables & equipment free from damage attributable to work (CP13 s.6)
-
All materials & reinforcement compliant with specification (CP13 s.3, CN Drawing)
-
Joint box frame and cover compliant with specification ( CP13, CN drawing)
-
New joint box correctly sited in relation to poles and trafficked areas ( CP13 s.6)
-
Jointing chamber constructed as per specification (CP13, CN drawing, SAL spec)
-
Duct entry by approved method and finished correctly ( CP13 s.6.2, CN drawing, SAL spec)
-
Correct support and restraint of cables/joints disturbed by works ( CP13 s.6.1)
-
Duct entry in safe location (CP13 s.6 Retro/In)
General Comments
-
Any further comments or recommendations arising from this inspection?
-
Add relevant site photos (please include as many as possible)
Sign Off
-
Name of MS3 Supervisor
-
Name of Site Supervisor / Foreman (if present) of sub contractor