Information
-
Document No.
-
Contractor Name
- Welch Civils
- BOUYANT-C
- T1
- MS3
- 360
-
Date and Time
-
Name of person completing this report
-
Location
-
Project / Site Name (i.e HUL117)
General
Quality Audit
Cable and splice works
-
Has the correct track been installed as per the design?
-
Has the correct sub duct been installed?
-
Has the correct cable been installed?
-
Has the tail into the FAT / FDT been taped correctly and cables routed around the box?
-
Have the FAT / FDT cables been labled correctly?
-
Has the FAT / FDT been labeled correctly?
-
Has the FAT / FDT been mounted to a mobra?
-
What is the overall quality of the works like?
Boxes
-
Is the box in at the correct depth?
-
Does the box have the correct flooring down?
-
Are all duct entry's into the box cut flush and bur free?
-
Has the mobra arm been fitted correctly?
-
Is the box free from debris and rubbish?
-
What is the overall box quality?
Toby Boxes
-
Is the correctly branded toby box in place?
-
Is the top of the toby level with the surface?
-
Is the toby free from obstruction?
-
Is the toby box located correctly in relation to the property?
-
What is the overall quality of the toby box?
General Comments
-
Any further comments or recommendations arising from this inspection?
-
Add relevant site photos (please include as many as possible)
Sign Off
-
Name & Signature of MS3 Supervisor
-
Name & Signature of Site Supervisor / Foreman