Information
-
Document No.
-
Contractor Name
- Welch Civils
- T1
- MS3
- AUS
- EDEN
- BOYANT-C
-
Date and Time
-
Name of person completing this report
-
Location
-
Project / Site Name (i.e HUL117)
-
Supervisor / Foreman at time of this inspection
GENERAL
-
Has the vehicle been parked / positioned in an approate location for the works?
-
Has a pre works check been completed and submitted?
-
Does the operatave have correct PPE for the task ahead?
SITE SETUP
-
Has the chapter 8 signage been placed out in the correct order and in approiate locations?
-
Has the opertive have enough gate guards for the task ahead (including the working area)?
-
Please add photos of the site set up.
ENTRY INTO CHAMBERS
-
Has the correct method of lifting and opening the chamber been followed?
-
Has a roller bar and pit lifter No 5 been used?
-
Has the chamber been fully gas tested at all duct entry points and the 3 diffferent levels?
-
Has the GDU been left in the correct location in the chamber while working?
WORKING IN CHAMBERS
-
Has the chamber been checked for hazards prior to works?
-
Has a water test been completed (if required)?
-
Have all new cables been secured as per BTOR / MS3 specs?
-
Have all cables been correctly labeled with all relevent information?
-
Has the chamber been left in a safe and hazard free condition?
EQUIPMENT CHECKS
-
Is the PPE been used is good condition, free from defects and correct for the work ahead?
-
Is the GDU been used in good condition, free from defect, fit for purpose and within test date?
-
What is the test date on the ladder?
-
Is the signing and guarding that is been used in good working order and fit for purpose?
Sign Off
-
Has a final chack of site been completed prior to leaving?
-
Have the MS3 / BTOR safety, spec and quality documents been adhered too throughout the works?
-
Do you wish to add in any notes or observations from this live audit?
-
Has qualification of the gangs been seen and is it in date?
-
Name of MS3 Supervisor
-
Name of Site Supervisor / Foreman