Information

  • Build to Suit Safety Report for BettPlex

  • BettPlex

  • Conducted on

  • Prepared by

  • Bettendorf,Ia
  • Personnel

POSTINGS

  • OSHA

  • Emergency Numbers

FIRST AID KIT

  • Available

PERSONAL PROTECTIVE EQUIPMENT

  • Eye Protection

  • Face Protection

  • Respiratory Protection

  • Hearing Protection

  • Hard Hats

  • Footwear

  • High Visibility Clothing

HOUSEKEEPING / SANITATION

  • Stairs, Exits, Walkways Kept Clear

  • Trip Hazards Protected

  • Waste Containers Provided and Used / Rubbish Removed

  • Material Properly Stacked and Orderly

  • Nails Bent or Removed

  • Spills Cleaned

  • Sanitary Facilities Available and Clean

  • Adequate Eating and Drinking Areas

  • Materials on Floor/Roof Secure From Wind

  • Puncture/Impalement Hazards Protected

  • Additional Housekeeping Concerns

FALL PROTECTION

  • Guardrails on Open Sided Floors/Edges

  • Top Rail B/T 39 & 45 Inches and Capable of Supporting 200lbs.

  • Toe Boards Where Needed

  • Mid Rails in Place

  • Cable Guardrails Flagged Every 6'

  • Roof Perimeter Protected or Warning Line Used

  • Holes Covered, Marked and Secured (Capable of Supporting 2x intended Load)

  • Employees Using Fall Protection Where Required

  • Sufficient Anchorage Points (5000lbs.)

  • Plan Written For Leading Edge Situations

  • Employees Working on Forms Protected

  • Tied Off in Aerial Lifts

  • Struck-By Hazards Eliminated

  • Additional Fall Protection Concerns

LADDERS / STAIRS

  • Ladders 3' Above Landing, Secured, and Set at 4 to 1 Ratio

  • Ladders in Good Condition

  • Area Around Top and Bottom of Ladder Kept Clear

  • Corral Around Access Ladders

  • Platform or Top Step of Stepladders Not Used

  • Metal Ladders Not Used for Electrical Work

  • Stepladders in Open Position Only

  • Handrails on Stairs with 4 Risers or More

  • Pan-Stairs Filled or Closed

  • Stairs Kept Clear

  • Additional Stair/Ladder Concerns

SCAFFOLDING

  • Guardrails Installed at 6'

  • Toe boards Where Needed

  • Working Platform Fully Decked

  • Access Ladders Provided

  • Scaffolds Properly Secured

  • Sufficient X-Bracing

  • Scaffolds on Solid Footing (No Cinderblocks)

  • Mud sills Used Where Necessary

  • Scaffolds Not Overloaded 4 Times the Maximum Load

  • Planking overlapped 12" or Secured

  • Planks Extend Over End Supports 6" to 12" or Secured

  • Diagonal Bracing on Rolling Scaffold

  • Fall Protection on Suspended Scaffold and Aerial Lifts

  • Chains Secured / Gates Closed on Scissor Lifts

  • Baker Scaffold has Outriggers at 8'

  • Plumb and Secure

  • No Overhead Electrical Exposure

  • No Riding Rolling Scaffold

  • Planking Free from Debris, Snow and Ice

  • Additional Scaffold Concerns

ELECTRICAL

  • GFCI's Used on All Outlets

  • Temp Panels Covered<br>No Empty Breaker Spaces

  • Access to Breaker Boxes Kept Clear

  • Lights Sufficient for Proper Illumination

  • Cords in Good Condition / Grounded / Away From Sharp Edges, Heat, Oil / Not Strained

  • Only SJ, SJO, SJT, SJTO, S, SO, or STO Hard Cords Used

  • ROMEX Protected From Physical Damage

  • Overhead Power Lines Accounted For:<br>De-Energized, Guarded, or Insulated

  • Electrical Equipment Secured and Fastened

  • Temp Lighting:<br>No Open Socket, Missing Cages and Properly Elevated

  • Additional Electrical Concerns

EXCAVATION & TRENCHING

  • Protective System in Place

  • Excavation Properly Sloped

  • Daily Inspection Made and Documented

  • Inspections After Rain Storms or Excavation Changes

  • Excavations Deeper than 20' Engineered

  • Spoils 2' from Edge

  • Access / Egress Provided if > 4'

  • Access / Egress Within 25' of All Workers

  • Able to Walk Upright on Ramps

  • Confined Space Hazard

  • Excavation Barricaded if Necessary

  • Equipment Away from Edge

  • Adjacent Structures Shored

  • Additional Excavation Concerns

HAZARD COMMUNICATION

  • MSDS On-Site & Up To Date

  • Written Program On-Site

  • Container Labeling:<br>Hudson Sprayers, Drums, Bottles, Etc....

  • Container Labeling Poster<br>Tags Available

  • Additional Hazard Communication Concerns

FIRE PREVENTION

  • Fire Extinguishers Provided and Tested

  • Fire ExtinguishersEvery 3,000 sq. ft.<br>Within 100' of All workers

  • Hot Work Permits Required and Used

  • Fire Watch Provided (Stays for 30 Min)

  • Flammable Liquids Properly Stored

  • Fuels in Metal, Properly Labeled Containers

  • Smoking Controls In-Place

  • LPG Containers Properly Stored

  • LPG Safety Relief Valve In-place

  • Fire Hydrant Kept Clear

  • Soiled or Combustible Rags in Appropriate Container

  • Additional Fire Concerns

MASONRY

  • LAZ Established (Unsupported Height Plus 4')

  • Block Walls > 8' Braced

  • Water Used When Cutting Brick, Block and Concrete

  • Respiratory Protection Used

  • Rebar Capped

  • Proper PPE Used to Prevent Concrete Burns

  • Additional Masonry Concerns

CRANES

  • Swing Radius Protected (360 Degrees)

  • Power Lines Identified and Marked if Necessary

  • Inspection of Cables, Slings, Chains, Hooks, & Eyes

  • Inspection Logs Maintained

  • Load Capacity Chart on Machine

  • Signal Persons Trained

  • Riggers Qualified

  • Additional Crane Concerns

TOOLS

  • Guards In-Place

  • Employees Trained on Powder Actuated Tools

  • Loaded Tools not Left Unattended

  • Radial Arm & table Saws Have Disconnect Switches

  • Belt Driven Equipment Has Fully Enclosed Guards

  • Air Hoses Secure

  • Tools Disconnected When Not in Use: Changing Bits & Blades

  • Damaged Tools Repaired or Replaced

  • Tools in Good Working Condition

  • Proper Tool Used &Grounded

  • Additional Tool Concerns

COMPRESSED GAS, WELDING & CUTTING

  • Cylinders Stored Upright, With Caps & Secured

  • Different Gases Stored 20+' Apart or Separated by Fire Wall

  • Gas Regulators Working Properly

  • Damaged Welding Cables, Regulators, or Gauges Removed

  • Valve Protection Caps In-Place When Not in Use & When Transporting

  • Additional Compressed Gas Concerns

PUBLIC PROTECTION

  • Construction Fence

  • Roadway / Sidewalk Protection

  • Adequate Warning Signs & Markers

  • Proper Access / Traffic Control

  • Additional Public Protection Concerns

VEHICULAR EQUIPMENT

  • All Vehicles Inspected Before Each Shift:<br>Brakes, Alarms, Tires, Horn, Seatbelt, Lights, Windshield Wipers, Defroster

  • Brakes and Reverse Alarm Functional

  • Load Capacities, Operating Speeds, Hazard Warnings Posted

  • Parking Brake Set and Loads Down When not in Use

  • Equipment Not Left Unattended When Parking on Slopes

  • Fire Extinguisher in Place and Fully Charged

  • Additional Vehicle Concerns

  • Do Heat Stress Conditions Exist:<br>High Temp/Humidity, Direct Sun, Limited Air, Poor Physical Condition

  • Drinking Water Available

  • Additional Rest Provided

  • Engineering Survey for All Demolition

  • Protection of Adjacent Structures

  • Public Protection (Sidewalk, Roads)

  • Clear Area for Chutes and Trucks

  • Chutes - Bumpers Used When Using Wheelbarrows and Carts

  • Chutes - Gates Used at Discharge End

  • Chutes - Angle Greater than 45 Degrees Must be Fully Enclosed

  • Additional Demolition Concerns

OTHER

  • Safety Equipment Needed On-Site

  • Miscellaneous Pictures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.