Information

  • Built In Quality Assessment

  • Area Manager

  • Focus Area

  • Document No.

  • Conducted on

Standardised Work

Standard Operation Sheets (SOS) Production + HSE

  • Have SOS sheets been implemented for all equipment and processes?

  • Is a program in place to monitor level of creation and implementation of existing SOS?

  • Is there a process to review, improve and periodical change SOS based on findings (planned and respected)?

  • Is SOS strictly followed by operators?

  • Is Standard Work for leaders in place and followed?

Training, Skill and Cell Certification

  • Is a flexibility (multiple-skill) matrix in place and implemented including target?

  • Is training scheduled an schedule plan is respected?

  • Is there training for new operators outside the production line eg dexterity school?

  • Are operators individual skills certified?

  • Is there team recognition of good performance and results?

Standard Combination Sheet

  • Is a process in place to periodically review or improve Standard Combination Sheets based on findings?

Process Change Log (6M Changes)

Planned Change

  • Does NPI planning, information flow down to operators?

  • Is info of planned change communicated on 6M board?

  • Is a tracking system in place for changes?

Unplanned Change

  • Is information of unplanned change communicated on the 6M board?

  • Are unplanned changes included in escalation process?

  • Is there an internal 8D/RCA system in place and functional?

  • Is there a tracking system in place for changes and reaction?

Visual Management

Data Driven Process Control.

  • Is capability data collection in place and SPC used for critical characteristics?

  • Is a plan in place to perform regular analysis of control chart, Cpk etc?

  • Is a system in place to perform continuous improvement for process capabilities?

  • Is RTY/FPY yield data collection in place for critical processes?

  • Is a system in place to hourly track rework or rejected parts?

  • Is system in place to identify and separate the scrap and rework part flow?

  • Are visual systems in place, installed on the lines?

  • Are layered audits in place and execution plan is respected?

5S

  • Is 5S system in place and effective, with clear standard quality points?

Jidoka-Autonomation

Escalation Process, Andon To Stop And Fix The Problem

  • Is quality performance visualised on performance boards (eg customer PPM, internal PPM, cost of scrap, quality pyramid)?

  • Do operators have possibility and authority to stop the line?

  • Are clear responsibilities assigned with defined triggers (eg #scrap/rework, SPC, PY) to start escalation)?

  • Is system in place and functional for visual tracking of issues?

  • Is system in place for improvement at all levels?

Elimination cause of defects

Rapid Problem Solving

  • Are trigger points for Root Cause Analysis defined?

  • Is there a system visual system in place to understand the actual status of Root Cause Analysis / 8D?

  • Are six sigma tools utilised (DMAIC)?

  • Are customer response times for 8D, information on time?

Kaizen

  • Are kaizen's generated and kaizen events planed to resolve quality issues ie error proofing?

Prevention cause of quality escapes

Quality Assurance MatrixIs

  • Is there a defined model for QAM (manual activities)?

  • Are clear responsibility assigned for QAM (who implements, who follows)?

  • Is QAM clearly linked to Standard Operation Sheets (refer quality points)?

Protect The Customer

  • Is there a PFMEA RPN score reduction program in place?

  • Are control plans and Standard Operation Sheets updated and linked to PFMEA?

  • Are CARE / Quality gates linked with Andon system and rapid Problem Solving?

  • Is early production containment linked with Andon and rapid problem solving?

Error Proofing

  • Is there a list of error proofing, classification and owner established?

  • Is there a reaction plan in case of malfunction (through escalation process)?

  • Is effectiveness of error proofing checked?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.