Information
-
Built In Quality Assessment
-
Area Manager
- Sam Dekok
- Annette Richards
- Lenny Coloca
-
Focus Area
- Preweigh Mixing
- Plate Stamping
- Plate Preperation
- IAG Moulding
- Troika Moulding
- Line 1
- Line 2
- Stores & RM Store
- Warehouse pick & pack
-
Document No.
-
Conducted on
Standardised Work
Standard Operation Sheets (SOS) Production + HSE
-
Have SOS sheets been implemented for all equipment and processes?
-
Is a program in place to monitor level of creation and implementation of existing SOS?
-
Is there a process to review, improve and periodical change SOS based on findings (planned and respected)?
-
Is SOS strictly followed by operators?
-
Is Standard Work for leaders in place and followed?
Training, Skill and Cell Certification
-
Is a flexibility (multiple-skill) matrix in place and implemented including target?
-
Is training scheduled an schedule plan is respected?
-
Is there training for new operators outside the production line eg dexterity school?
-
Are operators individual skills certified?
-
Is there team recognition of good performance and results?
Standard Combination Sheet
-
Is a process in place to periodically review or improve Standard Combination Sheets based on findings?
Process Change Log (6M Changes)
Planned Change
-
Does NPI planning, information flow down to operators?
-
Is info of planned change communicated on 6M board?
-
Is a tracking system in place for changes?
Unplanned Change
-
Is information of unplanned change communicated on the 6M board?
-
Are unplanned changes included in escalation process?
-
Is there an internal 8D/RCA system in place and functional?
-
Is there a tracking system in place for changes and reaction?
Visual Management
Data Driven Process Control.
-
Is capability data collection in place and SPC used for critical characteristics?
-
Is a plan in place to perform regular analysis of control chart, Cpk etc?
-
Is a system in place to perform continuous improvement for process capabilities?
-
Is RTY/FPY yield data collection in place for critical processes?
-
Is a system in place to hourly track rework or rejected parts?
-
Is system in place to identify and separate the scrap and rework part flow?
-
Are visual systems in place, installed on the lines?
-
Are layered audits in place and execution plan is respected?
5S
-
Is 5S system in place and effective, with clear standard quality points?
Jidoka-Autonomation
Escalation Process, Andon To Stop And Fix The Problem
-
Is quality performance visualised on performance boards (eg customer PPM, internal PPM, cost of scrap, quality pyramid)?
-
Do operators have possibility and authority to stop the line?
-
Are clear responsibilities assigned with defined triggers (eg #scrap/rework, SPC, PY) to start escalation)?
-
Is system in place and functional for visual tracking of issues?
-
Is system in place for improvement at all levels?
Elimination cause of defects
Rapid Problem Solving
-
Are trigger points for Root Cause Analysis defined?
-
Is there a system visual system in place to understand the actual status of Root Cause Analysis / 8D?
-
Are six sigma tools utilised (DMAIC)?
-
Are customer response times for 8D, information on time?
Kaizen
-
Are kaizen's generated and kaizen events planed to resolve quality issues ie error proofing?
Prevention cause of quality escapes
Quality Assurance MatrixIs
-
Is there a defined model for QAM (manual activities)?
-
Are clear responsibility assigned for QAM (who implements, who follows)?
-
Is QAM clearly linked to Standard Operation Sheets (refer quality points)?
Protect The Customer
-
Is there a PFMEA RPN score reduction program in place?
-
Are control plans and Standard Operation Sheets updated and linked to PFMEA?
-
Are CARE / Quality gates linked with Andon system and rapid Problem Solving?
-
Is early production containment linked with Andon and rapid problem solving?
Error Proofing
-
Is there a list of error proofing, classification and owner established?
-
Is there a reaction plan in case of malfunction (through escalation process)?
-
Is effectiveness of error proofing checked?