Information

  • Conducted on

  • Prepared by

Site Information

  • Add location
  • Add media

  • Local Government Area

  • Site ID

  • Stop Type

  • Traffic management appropriate

  • Environmental controls appropriate

Site Setout

  • Set out correct as per design

  • Slab setout correct size

  • J-Pole/Flag-pole correct type and location

  • PUP encountered

  • Ground preparation/bedding acceptable

  • Vegetation clearance

  • Breaking back/scabbling existing kerb

  • Reinforcing Steel

  • Grade correct

  • Size correct

  • Connection to existing slab correct/joints

Finishing Features

  • TGSI correct type, colour and location

  • Crossfall less than 2.5%

  • Longitudinal grade appropriate

  • Concrete 25Mpa or greater

  • Concrete broom finish satisfactory

  • Tie-in to existing footpath acceptable

  • Joints/saw cuts acceptable spacing

  • Kerb and transitions acceptable

  • Backfill/turf/make good acceptable

  • Other infrastructure installed correctly

  • Site left clean and tidy

  • Other comments

  • Sketch

  • Approved by TransLink representative

  • Approved by Council representative

  • Pictures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.