Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Outputs Required

  • Layout drawing showing all AC cassettes/Duct Vents

  • AC Cassettes/Ducted Vents clearly labelled with manufacturer and controller type. (photos required)

  • AC Condenser/AHU located and identified with gas type and model number (photos required)

  • Do any cassettes/vent outlets need relocating and if so, what is the proposed new location?

  • Local temp sensors (suspended or localised wall mount) marked on drawing and commissioned with RMB on phone – temp readings required to commission and be marked on drawing

  • Localised temp readings to be marked on drawing generally – 4x4m grid coverage including outside of the café demise (photos required)

  • Does the existing HVAC system currently spill into the salesfloor? (photos required)

  • Any external doors or fire escapes to be marked on the drawing with details of ODACs. (photos required)

  • Café extract system location to be marked on drawing with canopy sizes (photos required)

  • Café extract fan to be located on roof and drawing onto layout (photo required)

  • Where is the store refrigeration located in relation to the café – mark on drawing with measurements. (photos required)

  • Mark on drawing existing directional EM lights with arrow direction (photos required)

  • Mark on drawing existing ambient EM lights.

  • Mark on drawing any feature lighting, illuminated signage, hanging pendants etc that can be removed (photos required)

  • Ceiling heights to be marked on drawing throughout – any changes of level or services height to be denoted.

  • Location of any hot water services to be marked on drawing with system type and size (photos required)

  • Any islands with power, water and drainage to be marked on drawing with details of services (photos required)

  • Location of any gas appliances and routes of gas pipes to be marked on drawing (photos required)

  • Location of distribution boards to be marked on drawing with type, size and capacity (photos required)

  • All smoke heads, BGUs and sounders to be marked on drawing.

  • Mark customer/colleague toilets on drawings – notes to be made around any drains, hot water or ventilation systems which may be shared. (photos required)

  • Mark any windows or glazed walls on the plans with measurements (height and width).

Lighting information

  • Total number of track spots

  • Total number of track lights

  • Any other lighting provide information.

  • Lighting BOH
  • Area

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.