Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
General Overview
-
Add details regarding how the estate is controlled.
-
Provide information regarding roof plant.
-
Is anything in override?
- Yes
- No
- N/A
-
What's the condition of the building Assets?
-
Add information reported from maintenance issues?
-
What size VO is installed?( 383KVa MD)?
-
Check variation In Kit between,McDonalds,Leon,Spar, Etc.
-
McDonalds
-
Leon
-
Spar
-
Roadchef
-
Hotel
-
Costa Coffee
-
WH Smiths/Tray Wash
-
Cotton Traders
-
From the above what's driving the difference in usage?
-
Are the Sub-Meters in place and operational?
Power Distribution
-
Are Distribution boards serving multiple areas?
-
Condition/Sub Distribution Information?
-
Provide photos of all power DBs.
-
Any other information to assist with Inspection.