Title Page

  • please provide site for reference

  • Document reference

  • Conducted on

  • Prepared by

  • PROVIDE SNIP OF COMPARTMENT / APARTMENT

  • LOCATION = BLOCK - COMPARTMENT REFERANCE

INSPECTION / CHECKS

SETTING OUT

  • Has the setting out been done correctly and is it to the latest drawings ?

  • Are the windows and door openings constructed to the correct width, height and plumb ?

  • Confirm coursing, perps and plumb are within acceptable tolerance ?

  • Have movement joint been set out as per approved design and as per site requirements ?

BRICKWORK / BLOCKWORK

  • Have the bricks been mixed as per manufacturers instructions ?

  • Have the specified cavity ties been used and are the ties installed as per manufacturer’s instructions- correct spacing/embedment ?

  • Have lintels been installed as per manufacturer instructions including correct bearing and correctly embedded ?

  • Has Brick reinforcement been installed where applicable and has it been installed as per manufacturers instructions ? (where Applicable)

  • Have the Cavity's been left clean and tidy and have coring holes been installed correctly ?

  • Has the weep vents been installed as per the manufacturer’s instructions / specified centres ?

  • Has the work area been left clean and tidy once work have been completed ?

Keyfix (Non-combustible) cavity tray

  • Has the KEYFIX cavity tray been installed as per approved design (non-combustible) ?

  • Has the Cavity tray been installed as per manufacturers instructions (continuous DPC and on openings) ?

INSULATION

  • Has the correct insulation been installed per approved design ?

  • Rainscreen Duo Slab 220mm x 600 x 1200mm -- as per design
    Rainscreen Duo Slab 180mm x 600 x 1200mm -- as per design

  • * Has the brick tie channel be installed as per manufacturers instruction and with correct spacing ?

  • Has insulation been installed as per manufacturers instructions and is tightly abutted with no gaps ?

  • Have compression sleeves been installed as per manufacturers instructions ? WHERE APPLICABLE

MASONRY SUPPORT

  • Has the masonry support been installed as per manufacturers instructions ?

  • If marked N/A then no masonry support is on this compartment / apartment

  • Have bolts been torqued as per manufacturers specification and checked by a competent person ?

  • If marked N/A then no masonry support is on this compartment / apartment

  • Have pull out tests been carried out to post fix bolts if required ?

FIRE BARRIER / CAVITY BARRIER

  • Fire barrier type / manufacturer? SIDERISE EW/FS120BJ/1.2-1.2/P -1200x1200x120mm Fixing bracket = AN/BRKT/B355/G - Siderise RFT120 Aluminium Jointing Tape (120mm x 45m)

  • Has the fire barrier been approved by the architect and is installed as per approved design/ installation guides?

  • Have the correct fixings/brackets been installed with the correct spacing as per manufacturer instructions ?

  • Has the fire barrier/cavity barrier been installed correctly and is tightly abutted with no gaps ?

  • Has a Non-combustible DPC been installed between the cavity barrier and supporting structure ? (OBEX) where applicable

STONEWORK (COPINGS/WETCAST STONE)

  • Have fixings been installed as per manufacturers specification ? IF MARKED N/A THEN THERE IS NO STONEWORK ON THIS LEVEL !

  • If marked N/A then no stonework is on this compartment / apartment

  • Have stones been installed as as per approved design ? IF MARKED N/A THEN THERE IS NO STONEWORK ON THIS LEVEL !

  • If marked N/A then no stonework is on this compartment / apartment

ADDITIONAL INFORMATION

  • Please provide any additional relevant information/notes/photos here IF REQUIRED

NOTES

  • QA Sheets issued as work is progressing (works must be inspected by MC within 24 hrs of sheet submittal and will be deemed accepted after that period to ensure no delay to site progress)

SIGNATURES

  • 1) ON BEHALF OF CALLAN CONSTRUCTION

  • 1 ) DATE

  • 2) ON BEHALF OF PRINCIPLE CONTRACTOR--

  • 2 ) DATE

undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.