Title Page
-
Job Number/Name:
-
Site Address:
-
Postcode:
-
Surveyed by:
-
Date of Survey:
PCI and General Works Area
PRE CONSTRUCTION INFORMATION (PCI)
-
PCI (PRE-CONSTRUCTION INFORMATION) available and Risks have been factored in ?
BUILDING WORKS
-
Insert photographs of works areas
-
Will work take place on external face of building?
-
Will work take place internally in the communal areas of the building?
Site Specific Design Risk Assessment
WORKING AT HEIGHTS
-
A: Is there any working at heights?
Environment and Exposure
-
B1: Any Risk of Asbestos exposure during the works?
-
B2: Any Risk of needle injuries during Survey?
-
B3: Any Risk of Environmental hazards/Bees/Wasps/Vermin and hazardous waste during Survey?
-
B4: Any Risk of Un-cooperative residents or members of the public during the Survey?
-
B5: Any Risk of Chemical Hazards (Hazardous substances) during the Survey?
-
B6: Any Risk considerations towards Fire prevention and escape routes?
-
B7: Any Risk of Potential non-ionising Radiation exposure from transmitters on roof during Survey?
Other Risks
-
C: Are there any other Risks present on site that needs to be controlled?
Health and Safety Location Information
-
Welfare facilities on site - Enter Details
- Welfare facilities are available on-site and permission has been granted for their use
- Suitable welfare facilities to be arranged before deployment local to the site (build time estimated greater than 1 week) i.e. welfare vehicle, agreed arrangements with local businesses
- Facilities are conveniently accessible to this worksite for short duration work (build time estimated less than 1 week) in accordance with CIS46 & CIS59
- N/A
-
Is a Laydown / Storage Area required on site
-
Parking on site - Enter Location Details
Sign-Off
-
Surveyor Signature