Information

  • COM Number

  • Conducted on

  • Prepared by

  • Location

Inspection details

  • Inspection Type

  • Premises name

  • Email

  • Manager Name

  • ABN

  • Phone Number

  • Inspection date

Park details

  • Total number of sites

  • Number of long term sites

  • Number of short term sites

  • Number of camp sites

Administration and Park Information

  • Register of site owners maintained

  • Community map (site layout) on display

  • Community map on display & provided to Council

  • Approval to Operate valid

  • Information sheets for occupiers

  • Adequate visitor parking

  • Adequate wash bay area; no run off to river

Emergency Management and Site Safety

  • Emergency Management Plan; including evacuation site

  • Speed limit signage clearly visible <15kph

  • Appropriate road surfacing

  • Firefighting equipment<br>Hydrants<br>Hose reels<br>Extinguishers<br>Other appliances

  • Adequate lighting

  • Fire equipment annual certification

Drinking water supply, On-site Sewage Management and Waste (Subdivision 4)

  • Adequate areas for waste storage

  • Satisfactory waste removal methods

  • Approval issued for OSSM

  • OSSM disposal area satisfactory

  • Adequate stormwater drainage

Amenities (Toilets, shower rooms and laundry)

  • Toilets clean and sanitary.<br><br>Number available

  • Showers clean and sanitary. <br><br>Number available

  • Disabled facilities provided.<br><br>Number available

  • Laundry clean and sanitary.<br><br>Number available

  • Washing machine available.<br><br>Number available

  • Adequate clothes dryers

  • Adequate clothes drying areas (outdoor) (min. 50m)

  • Adequate electrical ports for ironing

  • Hot water available

  • Mirrors in good working order

  • Hand basins in good working order

Caravan site information

  • Site identification clearly visible

  • Site boundary delineation visible

  • Adequate width of road (4m single/6m dual lane)

  • Adequate vehicle/boat parking

  • Adequate visitor parking

  • Adequate site separation distance (2.5m)

  • Adequate setbacks (1m to road; 2m to boundary)

  • Site coverage under 2/3 of site

  • Structures have appropriate compliance plate

  • Caravans have running gear in good working order

Sites requiring attention

  • Comments

  • Site diagram (if required)

Result

  • Inspection result

  • Action Required

  • Manager's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.