Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Building Details
-
Building Description
-
building Class
- 1a A single dwelling being a detached house, or one or more attached dwellings, each being a building, separated by a fire-resisting wall, including a row house, terrace house, town house or villa unit
- 1b A boarding house, guest house, hostel or the like with a total area of all floors not exceeding 300m2, and where not more than 12 reside, and is not located above or below another dwelling or another class of building other than a private garage.
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9a
- 9b
- 9c
-
Building Height
-
Alternate Power Supplies Available
2. AUTOMATIC FIRE SPRINKLER SYSTEM - AS1851 section 2
1.1 Fire Safety Equipment Installed
-
AUTOMATIC FIRE SPRINKLER SYSTEM - AS1851 section 2
-
FIRE PUMPSETS - AS1851 section 3
-
FIRE HYDRANT SYSTEMS - AS1851 section 4
-
DELIVERY LAY FLAT FIRE HOSE - AS1851 section 5
-
FIRE DETECTION SYSTEMS - AS1851 section 6
-
SMOKE ALARMS AND HEAT ALARMS - AS1851 section 7
-
FIRE ALARM MONITORING SYSTEMS - AS1851 section 8
-
SOUND SYSTEMS FOR EMERGENCY PURPOSES - AS1851 section 9
-
INTERCOM SYSTEMS FOR EMERGENCY PURPOSES - AS1851 section 10
-
GASEOUS FIRE EXTINGUISHING SYSTEMS - AS1851 section 11
-
FIXED AEROSOL FIRE EXTINGUISHING SYSTEMS - AS1851 section 12
-
OPEN NOZZLE WATER MIST FIRE EXTINGUISHING SYSTEMS - AS1851 section 13
-
FIRE HOSE REELS - AS1851 section 14
-
PORTABLE AND WHEELED FIRE EXTINGUISHERS - AS1851 section 15
-
FIRE BLANKETS - AS1851 section 16
-
PASSIVE FIRE AND SMOKE CONTAINMENT SYSTEMS - AS1851 section 17
-
FIRE AND SMOKE CONTROL FEATURES OF HVAC SYSTEMS - AS1851 section 18
-
EMERGENCY EVACUATION PROCEDURES - AS1851 section 19
-
EGRESS
-
EXIT AND EMERGENCY LIGHTING - AS 2293.2
-
BACKFLOW PREVENTION - AS 2845
-
Automatic fire suppression (sprinkler).
-
- Automatic sprinkler systems are inspected and tested in accordance with AS 1851 section 2 on a weekly basis
-
- Additionally, a log book is required to be placed at the location of the sprinkler in order for the technician to record the results of each inspection, in accordance with AS 1851 section 2
-
Wall wetting sprinkler and drenched systems
-
- Wall wetting and drenched systems are inspected and tested in accordance with AS 1851 section 2 on a weekly basis
-
AS 1851 section 2.4.7 12 heads or less on a monthly basis
-
Location of Sprinkler System / Systems
-
Add media
-
Water Supply
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
2.1 Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
2.2 Six monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
2.3 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
2.4 Twelve yearly test date
-
Has the system been tested for the last twelve years ?
-
Select date
2.5 24 Twenty Four Yearly test date
-
Has the system been tested for the last twenty four years ?
-
Select date
2.6 Documentation
-
- AS 1851.6.2 PROCEDURES AND PRECAUTIONS
-
- Design and installation survey detection systems shall be surveyed on an annual basis in accordance with Clause 6.4.4
-
- C6.2.1 A detection survey is topically conducted visually from floor level and is intended to identify changes to the detection system or the building and it's environment which could impair the performance of the detection system.
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Is there any evidence of the annual survey being conducted ?
-
Is a block plan securely mounted in the valve room ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
3. FIRE PUMPSETS - AS1851 section 3
-
Electric and Diesel Pumps
-
- Fire Hydrant booster pumps are inspected in accordance to AS 1851 section 3 on a weekly basis.
-
- Additionally, in the case of a hydrant booster pump being present, a log book is required in order for the technician to record the results of each weekly inspection, in accordance with maintenance code AS 1851 Section 3.
-
Location of pump room
-
Add media
-
Water supply
-
Service provider details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
3.1 Six monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
3.2 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
3.3 Five Yearly Test date.
-
Has the system been tested in the last five years ?
-
Select date
3.4 Documentation
-
- AS 1851.6.2 PROCEDURES AND PRECAUTIONS
-
- Design and installation survey detection systems shall be surveyed on an annual basis in accordance with Clause 6.4.4
-
- C6.2.1 A detection survey is topically conducted visually from floor level and is intended to identify changes to the detection system or the building and it's environment which could impair the performance of the detection system.
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Is a block plan securely mounted in the valve room ?
-
Is there any evidence of the annual survey being conducted ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
4. FIRE HYDRANT SYSTEMS - AS 1851 section 4
-
Fire Hydrant System
-
- fire hydrants are inspected and tested in accordance with AS 1851 section 4 on a six monthly basis
-
- Every year unassisted flow test is required
-
- Hydrant Boosters, Every year unassisted flow test is required. Every five years an assisted flow test is required
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
4.1 Six monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
4.2 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
4.3 Five Yearly Test date.
-
Has the system been tested in the last five years ?
-
Select date
4.4 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
5. DELIVERY LAY FLAT FIRE HOSE -AS1851 section 5
-
Lay Flat Hoses
-
Delivery lay flat hoses are inspected and tested in accordance with AS1851 section 5 on a yearly basis
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
5.1 Annual test dates (Previous year)
-
Has the system been tested in the last year ?
-
Select date
5.2 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
6. FIRE DETECTION SYSTEMS -AS1851 section 6
-
Automatic fire detection and alarm system
-
Automatic fire detection and alarm systems (panels) are inspected and tested in accordance with AS1670 & AS1851 section 6 on a monthly basis
-
Additionally, a log book is required to be placed at the location of the fire indicator panel in order for the technician to record the results of each inspection, in accordance with AS 1851 section 6.
-
Location of Fire Indicator Panel
-
Add media
-
Manufacturer
-
System type
-
Local System or Brigade Connected?
-
Provision to alert occupants ?
-
Are there sub indicator panels?
-
Installation Standard
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
6.1 Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
6.2 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
6.3 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
6.4 Five yearly test date
-
Has the system been tested for the last five years ?
-
Select date
6.5 Documentation
-
Documentation shall be housed in or adjacent to the FIP without interfering with the system wiring. The following documentation shall be provided upon completion of the commissioning tests: (a) 'As-installed' drawings covering the system or alterations, as applicable. Standard symbols, as given in Appendix D, shall be used. The drawings shall show the following, where applicable (see also Figures D1 and D2, appendix D)
-
- Design and installation survey detection systems shall be surveyed on an annual basis in accordance with Clause 6.4.4
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
- C6.2.1 A detection survey is typically conducted visually from floor level and is intended to identify changes to the detection system or the building and it's environment which could impair the performance of the detection system.
-
Is there any evidence of the annual survey being conducted ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
-
CIE Documentation as required by AS 4428.1 or AS 7240.2 available ?
-
Commissioning test report available ?
-
Installers statement in accordance with appendix E of AS 1670.1 available ?
-
A log complying with the requirements of clause 7.3 of AS 1670.1 available ?
-
Aspirating system design tool calculation available ? (if applicable)
-
Is a zone block plan securely mounted adjacent to the FIP ?
-
AS-Installed drawings available ?
-
Report conclussion including any recommendations.
7. SMOKE ALARMS AND HEAT ALARMS - AS1851 section 7
-
Smoke and heat detectors
-
- Back to panel - Smoke and heat detectors are inspected and tested in accordance with AS 1851 section 7 on a yearly basis.
-
- 240 Volt - Smoke and heat detectors are inspected and tested in accordance with AS1851 section 7 on a six monthly basis.
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
7.1 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
7.2 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
7.3 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Report conclussion including any recommendations.
8. FIRE ALARM MONITORING SYSTEMS - AS1851 section 8
-
Alarm Monitoring
-
- Alarm Monitoring is inspected and tested in accordance with AS 1851 section 8
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
8.1 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
8.2 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Report conclussion including any recommendations.
9. SOUND SYSTEMS FOR EMERGENCY PURPOSES - AS1851 section 9
-
Audio Visual Devices
-
- Sound Systems inspected and tested in accordance with AS 1851 section 9
-
Location of Audio visual device
-
Add media
-
Manufacturer
-
System type
-
Year of installation
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
9.1 Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
9.2 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
9.3 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
9.4 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
10. INTERCOM SYSTEMS FOR EMERGENCY PURPOSES - AS1851 section 10
-
Emergency warning and intercommunication system
-
Emergency warning and intercommunication system (EWIS) are tested in accordance with AS 1851 section 10
-
Location of Audio visual device
-
Add media
-
Manufacturer
-
System type
-
Year of installation
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
10.1 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
10.2 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
10.3 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
11. GASEOUG FIRE EXTINGUISHING SYSTEMS - AS 1851 section 11
-
Gas Dump System
-
- Gas fire extinguishing systems are inspected & tested in accordance with AS 1851 section 11 on a monthly basis
-
Location of Gas system
-
Add media
-
Manufacturer
-
System type
-
Year of installation
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
11.1 Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
11.2 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
11.3 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
11.4 Five yearly test date
-
Has the system been tested for the last five years ?
-
Select date
11.5 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
12. FIXED AEROSOL FIRE EXTINGUISHING SYSTEMS - AS 1851 section 12
-
Aerosol Dump System
-
- Aerosol fire extinguishing systems are inspected & tested in accordance with AS 1851 section 12 on a monthly basis.
-
Location of Aerosol system
-
Add media
-
Manufacturer
-
System type
-
Year of installation
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
12.1 Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
12.2 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
12.3 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
12.4 Five yearly test date
-
Has the system been tested for the last five years ?
-
Select date
12.5 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
13. OPEN NOZZLE WATER FIRE EXTINGUISHING SYSTEMS - AS 1851 section 13
-
Wet Mist Extinguishing Systems
-
- Wet mist fire extinguishing systems are inspected and tested in accordance with AS 1851 section 13 on a monthly basis
-
Location of Wet Mist System
-
Add media
-
Manufacturer
-
System type
-
Year of installation
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
13.1 Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
13.2 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
13.3 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
13.4 Five yearly test date
-
Has the system been tested for the last five years ?
-
Select date
13.5 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
14. FIRE HOSE REELS - AS 1851 section 14
-
Fire Hose Reels
-
- Fire Hose Reel systems are inspected and tested in accordance with AS 1851 section 14 on a six monthly basis
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
14.1 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
14.2 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
14.3 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
15. PORTABLE AND WHEELED FIRE EXTIBGUISHERS - AS 1851 section 15
-
Portable Fire Extinguishers
-
- Portable fire extinguishers are inspected and tested in accordance with AS 1851 section 15 on the six monthly basis
-
- Additionally, five years pressure testing is required, plus recharging when an extinguisher is discharged
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
15.1 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
15.2 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
15.3 Five yearly test date
-
Has the system been tested for the last five years ?
-
Select date
15.4 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
16. FIRE BLANKETS - AS 1851 section 16
-
Portable fire blankets
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
16.1 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
16.2 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
16.3 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any critical defects been recorded in the previous 12 months ?
-
Have any non-critical defects been reported in the previous 12 months ?
17. PASSIVE FIRE AND SMOKE CONTAINMENT SYSTEMS - AS 1851 section 17
-
Fire Dampers
-
- Fire Dampers are inspected and tested in accordance with AS 1851 section 17 on a six monthly basis
-
Fire Doors
-
- Fire Doors are inspected and tested in accordance with AS 1851 section 17 on a three monthly basis
-
Fire Walls and Barriers / Separations
-
- Fire walls barriers are inspected and tested in accordance with AS1851 section 17 on a six monthly basis
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
17.1 Three Monthly test dates (Previous twelve months)
-
Has the system been tested for the last three months ?
-
Select date
-
Select date
-
Select date
-
Select date
17.2 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last six months ?
-
Select date
-
Select date
17.3 Annual test dates (Previous year)
-
Has the system been tested for the last twelve months ?
-
Select date
17.4 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any non-critical defects been reported in the previous 12 months ?
-
Have any critical defects been recorded in the previous 12 months ?
18. FIRE AND SMOKE CONTROL FEATURES OF HVAC SYSTEMS - AS 1851 section 18
-
Mechanical Air Handling System
-
- Mechanical air handling systems are inspected and tested in accordance with AS1851 section 18 on a three monthly basis
-
- Pressurizing systems (smoke supply air fans) are inspected in accordance with AS1851 section 18 on a three monthly basis
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
18.1 Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
18.2 Three Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
-
Select date
-
Select date
18.3 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
18.4 Annual Test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
18.5 Five Yearly Test dates
-
Has the system been tested in the last 5 years?
-
Select date
18.6 Twelve yearly Test dates
-
Has the system been tested for the last twelve years?
-
Select date
18.7 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any non-critical defects been reported in the previous 12 months ?
-
Have any critical defects been recorded in the previous 12 months ?
19. Emergency Evacuation Procedures - AS 1851 section 19
-
Emergency Plans & Evac Procedures
-
- Emergency plans & Evac procedures are inspected in accordance with AS 1851 Section 19 on a monthly basis
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
19.1 Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
-
Select date
19.2 Six monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
19.3 Annual test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
19.4 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any non-critical defects been reported in the previous 12 months ?
-
Have any critical defects been recorded in the previous 12 months ?
20.0 Egress
-
Paths of travel, Stairways, Passageways or Ramps
-
- Paths of travel for stairways, passageways and ramps are done in accordance to BCA D2.23 on a yearly basis
-
Warning and Operational Signs (stairway notices)
-
- Warning and operational signs are inspected in accordance with BCA D2.23 at the same time that fire doors are inspected and tested on a yearly basis
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
20.1 Annual test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
20.2 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 1851-2005 section 1 ?
-
Have any non-critical defects been reported in the previous 12 months ?
-
Have any critical defects been recorded in the previous 12 months ?
21.0 Exit & Emergency Lighting -AS2293.2
-
Exit & Emergency Lighting
-
- Exit & Emergency Lights are inspected and tested in accordance with AS 2293.2 and AS 2293.3 on a six monthly basis
-
Service Provider Details
-
Is there evidence of competent person conducting the maintenance ?
-
Does your service provider hold the appropriate BSA license to pro-form these tests.
-
- The occupier of a building must ensure that the maintenance of each prescribed fire safety installation for the building is carried out by an appropriately qualified person.
21.1 Six Monthly test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
-
Select date
21.2 Annual test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
21.3 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 2293.2 ?
-
Have any non-critical defects been reported in the previous 12 months ?
-
Have any critical defects been recorded in the previous 12 months ?
22.2 Annual test dates (Previous twelve months)
-
Has the system been tested for the last twelve months ?
-
Select date
22.3 Documentation
-
Have all tests been completed within the frequency toll arranges set out in AS 2845 ?
-
Have any non-critical defects been reported in the previous 12 months ?
-
Have any critical defects been recorded in the previous 12 months ?
Notes and Comments
-
Report conclussion including any recommendations.
Sign Off
-
On site representative
-
Auditor's signature