Title Page
-
Document No.
-
This audit is for the monitoring of cake samples produced in the Category 1&2 plant. And the recording of trailer samples to ensure that reactive measures are taken in the event that the end product does not fall within company tolerances. The QR code is situated in the water treatment plant near the NIR machine and must be scanned every time a sample is tested.
-
Time samples taken.
-
Which cooker/cookers are currently running?
- Cooker 4
- Cooker 5
- Both Cookers
-
Four samples should be taken for each trailer of Cat 1&2 cake. One from each pile on the trailer. The trailer may not be removed from the tunnel until results of the samples are known.
-
Once the samples have been ground, take to the WTP Laboratory, and measure each one separately using the NIR machine.
-
Please scan the QR point next to the NIR machine in the laboratory.
-
Once the sample has been measured by the NIR and the results displayed on screen. Take a photo of the results for:
-
First sample
-
Second sample
-
Third sample
-
Fourth sample
-
Comments regarding samples or trailer.
-
Do the results of the samples fall within the set criteria for Category 1&2 finished cake? (Oil needs to be below 15%)
- Yes
- No
-
Enter name of signee
-
Manager / Supervisor to visually inspect the contents of the trailer to ensure finished product is satisfactory.
-
Which trailer number is this for the shift?
- 1st
- 2nd
- 3rd
- 4th
- 5th
- 6th
-
Take a photograph of the finished product within the trailer
-
Enter the time the trailer left the Category 1&2 plant.
-
Managerial sign off