Title Page

  • Document No.

  • Name of Substation

  • Conducted on

  • Location
  • Report Prepared By

A. Power Transformers

  • 1. Appearence

  • 2. Bushing Clean, good condition

  • 3. Oil Levels and gauges

  • 4. Free from oil leaks

  • 5. Thermometers OK, Maximum

  • 6. Auxiliary cooling equipment

  • 7. Gas Pressure

  • 8. Record Oil Temperature

  • 9. Record Winding Temperature

Power Transformer Recordings

  • Power Transformer (A) or (3 Phase)

  • Power Transformer Tap Setting

  • Maximum Load Amperes (A)

  • Maximum Temperature (A)

  • LTC Recordings

  • LTC Tap Position

  • Maximum Boost (A)

  • Maximum Buck (A)

  • LTC Output Voltage

  • LTC Oil Level

  • LTC Gas Pressure

B. Voltages & Voltage Regulators

  • 10. Bushings clean, good condition

  • 11. Oil levels and gauges

  • 12. Free from oil leaks

  • 13. Indicating lights working

  • 14. Indicating glass covers

  • 15. Cabinet Gaskets weather tight

  • 16. Operation Check

  • 17. Appearance

Regulator Recordings

  • Regulator (A)

  • Regulator Counter Reading (A)

  • Current Tap Position

  • Maximum Boost (A)

  • Maximum Buck (A)

  • Voltage Regulated (A)

  • Voltage Unregulated (A)

  • Regulator (B)

  • Regulator Counter Reading (B)

  • Current Tap Position (B)

  • Maximum Boost (B)

  • Maximum Buck (B)

  • Voltage Regulated (B)

  • Voltage Unregulated (B)

  • Regulator (C)

  • Regulator Counter Reading (C)

  • Current Tap Position (C)

  • Maximum Boost (C)

  • Maximum Buck (C)

  • Voltage Regulated (C)

  • Voltage Unregulated (C)

C. VSO

  • 18. Appearance

  • 19. Bushing clean, good condition

  • 20. Panel Inspection

  • VSO 1

  • VSO Counter Reading

  • VSO Amperage Reading

D. VSA , NOVA, OCRs

  • 21. Circuit #

  • Circuit Protection Device

  • Appearence

  • Bushings Clean, good condition

  • Panel Inspection

  • Free from oil leaks

  • Record Readings

  • Circuit (A Phase) or VSA Counter Reading

  • Circuit (B Phase) Counter Reading

  • Circuit (C Phase) Counter Reading

  • Circuit (A Phase) or VSA Amperage Reading

  • Circuit (B Phase) Amperage Reading

  • Circuit (C Phase) Amperage Reading

  • 22. Circuit #

  • Circuit Protection Device

  • Appearence

  • Bushings Clean, good condition

  • Panel Inspection

  • Free from oil leaks

  • Record Readings

  • Circuit (A Phase) or VSA Counter Reading

  • Circuit (B Phase) Counter Reading

  • Circuit (C Phase) Counter Reading

  • Circuit (A Phase) or VSA Amperage Reading

  • Circuit (B Phase) Amperage Reading

  • Circuit (C Phase) Amperage Reading

  • 23. Circuit #

  • Circuit Protection Device

  • Appearence

  • Bushings Clean, good condition

  • Panel Inspection

  • Free from oil leaks

  • Record Readings

  • Circuit (A Phase) or VSA Counter Reading

  • Circuit (B Phase) Counter Reading

  • Circuit (C Phase) Counter Reading

  • Circuit (A Phase) or VSA Amperage Reading

  • Circuit (B Phase) Amperage Reading

  • Circuit (C Phase) Amperage Reading

  • 24. Circuit #

  • Circuit Protection Device

  • Appearence

  • Bushings Clean, good condition

  • Panel Inspection

  • Free from oil leaks

  • Record Readings

  • Circuit (A Phase) or VSA Counter Reading

  • Circuit (B Phase) Counter Reading

  • Circuit (C Phase) Counter Reading

  • Circuit (A Phase) or VSA Amperage Reading

  • Circuit (B Phase) Amperage Reading

  • Circuit (C Phase) Amperage Reading

E. Airbreak & Disconnect Switches

  • 29. Appearence

  • 30. Ground Connection to handle

F. Bypassing Switches

  • 31. Appearence

  • 32. Insulators

G. Miscellaneous Electrical Equipment

  • 33. Arresters: appearance and connections

  • 34. Circuits and phase identification

  • 35. Rock is level and no voids at fence

  • 36. Overhead ground wire

  • 37. Equipment grounds

  • 38. Fences and gates grounded

  • 39. Exits, walkways and driveways clear

  • 40. Substation enclosure free of stored material and equipment

  • 41. Gates properly locked<br>

  • 42. Suitable warning signs on fences and inside Substation. Check for AMR transformer / 3 phase cabinet stickers

  • 43. High Side Fuse Size

  • 44. Spare High Side Fuses on site

  • 45. Is the substation clear of vegetation

  • 47. You have read and reset max current pointers, recorded currents and times of day

  • 49. All fire extinguishers inspected

  • 50. Substation sticks have been inspected and are in current years test

  • 51. Substation high voltage gloves are in test and accessible

  • General Comments

  • Pictures tied to general comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.