Information
-
Audit Title/Site
-
Conducted on
-
Location
-
Prepared by
- Sam Collins
- Kevin Howland
-
Foreman
- Brian Baril
- Matt Brien
- Joe Miguel
- Joe Figueiredo
- Joe Medeiros
- Mario Oliveira
- Frank Teves
- Rich Nievera
- Steve Ventura
- Rich Riendeau
- Dan Mills
- Brian Davis
-
Foreman
-
Weather
-
CDI Division on Site
- Drywall
- Fire Proofing
- Painting
-
Carpenters
-
Laborers
-
Tapers
-
Painters
-
Work Performed
Personal Protective Equipment
-
Hard hats
-
Hard hats
-
Hard hats
-
Hard hats
-
Hard hats
-
Hard hats
-
Hard hats
-
Class 2 vest
-
Class 2 vest
-
Class 2 vest
-
Class 2 vest
-
Hearing protection
-
Hearing protection
-
Hearing protection
-
Hearing protection
-
Hearing protection
-
Eye protection
-
Eye protection
-
Eye protection
-
Eye protection
-
Eye protection
-
Eye protection
-
Proper foot protection
-
Face shield or goggles
-
Face shield or goggles
-
Gloves
-
Gloves
-
Gloves
-
Gloves
-
Gloves
-
Gloves
-
Gloves
-
Respirators/chemical resistant garments
-
Respirators/chemical resistant garments
-
Respirators/chemical resistant garments
-
Respirators/chemical resistant garments
Fall Protection
-
Use of anchor points.
-
Use of anchor points.
-
Use of anchor points.
-
PFAS worn in a proper manner?
-
PFAS worn in a proper manner?
-
PFAS worn in a proper manner?
-
Fall protection equipment maintained and inspected?
-
Fall protection equipment maintained and inspected?
-
Fall protection equipment maintained and inspected?
-
PFAS utilized at loading zones with guardrails in place.
-
PFAS utilized at loading zones with guardrails in place.
-
Fall protection equipment shall not be used for rigging.
-
Fall protection equipment shall not be used for rigging.
-
Guardrails/PFAS utilized when near perimeters, elevator shafts, windows, and stairways. > 6 ft. Fall hazard.
-
Guardrails/PFAS utilized when near perimeters, elevator shafts, windows, and stairways. > 6 ft. Fall hazard.
-
Wall openings are properly covered.
-
Wall openings are properly covered.
-
Guardrails shall be able to withstand at least 200 lbs. of force.
-
Guardrails shall be able to withstand at least 200 lbs. of force.
-
Workers protected near floor openings.
-
Workers protected near floor openings.
-
Workers protected around roof openings.
-
Workers protected around roof openings.
-
Guardrail height 42 inches +\- 3 inches
-
Guardrail height 42 inches +\- 3 inches
Scaffolds
-
18 inches of walking/working surface
-
18 inches of walking/working surface
-
Scaffold guardrail height (when 6 ft. or higher) 42 inches +\- 3 inches
-
Scaffold guardrail height (when 6 ft. or higher) 42 inches +\- 3 inches
-
Inspected and used properly.
-
Inspected and used properly.
-
Scaffold tag present when applicable.
-
Scaffold tag present when applicable.
-
Guardrails in place when required.
-
Guardrails in place when required.
-
Guardrails in place when required.
-
Guardrails in place when required.
-
Proper access and egress required.
-
Proper access and egress required.
-
Proper access and egress required.
-
Components are free from defect.
-
Components are free from defect.
-
Components are free from defect.
-
Aerial and scissor lifts are properly inspected.
-
Aerial and scissor lifts are properly inspected.
-
Fall protection utilized on aerial lifts.
-
Fall protection utilized on aerial lifts.
-
Fall protection utilized on aerial lifts.
-
Fall protection utilized on aerial lifts.
Ladders
-
Proper angle using 4:1 ratio.
-
Proper angle using 4:1 ratio.
-
Exceeds landing by 3 feet.
-
Exceeds landing by 3 feet.
-
Ladder properly secured to prevent movement.
-
Ladder properly secured to prevent movement.
-
Worker is not using top 2 steps of stepladder.
-
Worker is not using top 2 steps of stepladder.
-
Worker is not using top 2 steps of stepladder.
-
Stepladder used only in the open position and fully locked.
-
Stepladder used only in the open position and fully locked.
-
Stepladder used only in the open position and fully locked.
-
Inspected and free from defect.
-
Inspected and free from defect.
Housekeeping/General Safety
-
Project work areas are clean and free of excess trash and debris.
-
Project work areas are clean and free of excess trash and debris.
-
Walkways and passageways are clear.
-
Walkways and passageways are clear.
-
Material or equipment is properly stored.
-
Material or equipment is properly stored.
-
Electrical cords, hoses, etc. installed to prevent trip hazards.
-
Electrical cords, hoses, etc. installed to prevent trip hazards.
-
Scrap metal/material free from protruding nails or other puncture hazards.
-
Scrap metal/material free from protruding nails or other puncture hazards.
-
Trash receptacles are provided for work areas.
-
Trash receptacles are provided for work areas.
-
Barricades and/or rebar caps are installed and maintained
-
Barricades and/or rebar caps are installed and maintained
-
Wall openings/floor holes
-
Wall openings/floor holes
-
Electrical
-
Electrical
-
Slip/trip hazards
-
Slip/trip hazards
Tools and Equipment
-
Electrical cords- condition.
-
Electrical cords- condition.
-
Exposed wires?
-
Exposed wires?
-
Missing ground pin?
-
Missing ground pin?
-
Tools are maintained in a safe condition
-
Tools are maintained in a safe condition
-
Tools are maintained in a safe condition
-
Pneumatic/hydraulic hose connections properly secured.
-
Pneumatic/hydraulic hose connections properly secured.
-
Tools are carried and stored.
-
Tools are carried and stored.
-
Proper tools used for the job performed.
-
Proper tools used for the job performed.
-
Guards and shields in place.
-
Guards and shields in place.
-
Guards and shields in place.
-
Hilti clips are free from live rounds.
-
Hilti clips are free from live rounds.
-
Job lights have cages on them to prevent the glass from breaking.
-
Job lights have cages on them to prevent the glass from breaking.
-
Job lights have cages on them to prevent the glass from breaking.
-
Job lights have cages on them to prevent the glass from breaking.
-
Job lights have cages on them to prevent the glass from breaking.
Fire Protection
-
Flammables are stored properly.
-
Flammables are stored properly.
-
Fire extinguishers are inspected.
-
Fire extinguishers are inspected.
-
Fire extinguisher is located near chop saw or other Hot Work procedures.
-
Fire extinguisher is located near chop saw or other Hot Work procedures.
-
Combustibles removed in area of hot work.
-
Combustibles removed in area of hot work.
Permits/signage/documentation
-
Hot Work permit.
-
Hot Work permit.
-
JHA
-
JHA
-
Toolbox talk.
-
Toolbox talk.
-
MSDS's
-
MSDS's
-
Laser in use signage.
-
Laser in use signage.
-
Laser in use signage.
Comments
-
General Comments
-
Add media
-
Add media
-
Add drawing
-
Was anyone injured on site?
-
CDI Incident Report completed?
-
Add signature