Project Information

Observation Details and General Comments

  • Observation Details:

  • Actions Required:

  • General Comments:

  • Project Title

  • Project Location
  • Inspected By

  • Date of Inspection

  • Brief description of works

  • Client

  • Mitie PM

  • Principal Contractor

  • Main Contractor

  • Sub-contractor(s)

  • Site Supervisor

  • Project Start Date

  • Anticipated End Date

  • Current works on site

1.0 Pre-Construction Information

1.1 Project Introduction, Objective & Key Dates

1.2 Project Team & CDM Duty Holders

1.3 Existing Client Information (Pre-Construction Information)

1.4 Existing Client Site Hazards & Restrictions

1.5 F10 Notification of the Project

2.0 Construction Arrangements

2.1 Health & Safety Goals & Standards for the Project

  • 2.1 Are there Health & Safety goals and standards for the project in the CPP?

2.2 Project Management Roles & Responsibilities

  • 2.2.1 Are project management roles & responsibilities detailed within the CPP?

  • 2.2.2 Is a Site Management Folder available for review?

2.3 Health & Safety Inductions

  • 2.3 Are Health and Safety Inductions being carried out on site?

2.4 Arrangements for Communication

  • 2.4.1 Are arrangements in place for Progress meetings?

  • 2.4.2 Are Daily/Task Briefings being carried out?

  • 2.4.3 Are Toolbox Talks being delivered on site regularly?

  • 2.4.4 Has a Health & Safety notice board been established?

  • Is there a Mitie Lifeline poster displayed?

2.5 Exchange of Design Information & Handling Design Changes

  • Are there arrangements in place for communicating design change?

2.6 Access & Security of the Site

  • 2.6.1 Is there safe Access and Egress to and from the site?

  • Is there a site sign-in register on site?

  • 2.6.2 Are there suitable and sufficient measures in place for securing the site?

  • 2.6.3 Has relevant security clearance/vetting been obtained for access to site?

2.7 Welfare & First Aid

  • 2.7.1 Have suitable Welfare Facilities been provided?

  • 2.7.5 Are First Aid provisions available?

  • Who is the site first aider?

2.8 Fire and Emergencies

  • 2.8.1 Has a Fire Risk Assessment of the site been undertaken by the Main Contractor?

  • 2.8.2 Has an Emergency Plan been prepared?

2.9 Accident and Incident Reporting & Investigations

  • 2.9 Have there been any Accidents or Incidents on the project and have they been reported to Mitie?

  • Please provide details

  • Please provide details

2.10 Selection and Control of Contractors

  • 2.10 How are Sub-contractors assessed & selected?

2.11 Permit to Work Systems

  • 2.11 Are permits to work available and being issued?

2.12 Monitoring Health & Safety Performance

  • 2.12 Are formal health and safety site inspections being carried out on site by the Contractor?

2.13 Personal Protective Equipment (PPE)

  • 2.13.1 Are operatives using the mandatory PPE as detailed in the site rules?

  • 2.13.2 Is task specific PPE being worn as identified in the RAMS?

2.14 Competency and Training

  • 2.14.1 Are Competencies available for the Main Contractor's Operatives?

  • 2.14.2 Are Sub-contractor Competencies available?

2.15 Housekeeping

  • 2.15 What is the quality of Housekeeping?

2.16 Waste Management

  • 2.16.1 Is there suitable waste management arrangements in place?

  • 2.16.2 Does the Main Contractor hold a waste carriers licence or equivalent certificate?

  • How is waste removed from site?

  • What is the name of the company removing waste from site?

2.17 Deliveries and Storage of Materials

  • 2.17.1 Is suitable and secure site storage available?

  • 2.17.2 Are arrangements in place to manage deliveries?

2.18 Site & Traffic Management Plan

  • 2.18 Is there a Site and a Traffic Management plan available?

2.19 Quality Management

  • Does the Main Contractor have a Quality Plan or Quality Policy in place?

2.20 Co-ordinating with Others

  • How is the Main Contractor co-ordinating with the Client and other Stakeholders?

2.21 Risk Assessments and Method Statements

  • 2.21.1 Are all Risk Assessments & Method Statements relating to the project available on site?

  • 2.21.2 Have all RAMS been communicated and signed on?

2.22 Environmental

  • 2.22 Are any environmental hazards and risks present?

  • How are these environmental hazards and risks being controlled?

3.0 Project Hazards & Risks

3.1 Asbestos

  • 3.1.1 Is the management of Asbestos or any ACM's Involved in the Project?

  • Is there an Asbestos Management Plan/Policy available?

  • Has an R&D Survey been carried out on the Project?

  • Has the Asbestos been removed by a licensed contractor?

  • Who is the licensed contractor?

3.2 Confined Spaces

  • 3.2.1 Does this Project involve undertaking work within a Confined Space?

  • Is the work in Confined Space being managed correctly as per the Construction Phase Plan and RAMS?

3.3 COSHH

  • 3.3 Are there any Hazardous Substances or Materials being used on this Project? (COSHH)

  • Are COSHH Data sheets & Assessments available for all identified hazardous substances?

3.4 Dust

  • 3.4.1 Are the works being undertaken on this Project generating Dust?

  • Are there adequate control measures in place for Dust exposure?

3.5 Electricity

  • 3.5.1 Do any works on site require the management of Electricity?

  • What works are being undertaken that require the management of Electricity?

  • Is this work being managed safely in line with the site RAMS and CPP?

  • 3.5.2 Are power tools, plant or equipment in use on this project?

  • What tools, plant or equipment are in use on the project?

  • Is there evidence of maintenance and inspection for the identified equipment?

3.6 Hot Works

  • 3.6.1 Are any Hot Works taking place on the Project?

  • Please state what Hot Works are taking place:

  • Are Hot Works permits in place for the works?

3.7 Manual Handling

  • 3.7.1 Is Manual Handling being carried out safely on site as per the site RAMS and the CPP?

3.8 Noise

  • 3.8.1 Is Noise being managed as per the RAMS and CPP?

3.9 HAVS

  • 3.9.1 Are HAVS being managed safely in line with the RAMS and CPP?

3.10 Work at Height

  • 3.10 Does this project involve Working at Height?

  • What equipment is being used for working at height?

  • Are the Stepladders being used in a safe manner?

  • Are the Stepladders free from defects and inspected regularly?

  • Have the Mobile Towers been installed by a competent person? (PASMA)

  • Are Mobile Towers being used in a safe manner?

  • What access system has been utilised?

  • is there a record of inspection?

  • Is Fall Protection equipment being utilised? (Harness & Lanyard)

  • Is there an inspection record for the Fall Protection equipment?

  • Is the correct type of MEWP being used for the task?

  • Are the MEWPs being used in a safe manner?

  • Are the MEWPs being used by a competent person? (IPAF)

  • Has the Scaffold been installed by competent persons?

  • Is the Scaffold in good order and safe for use?

  • Have weekly Scaffold inspections been undertaken by a competent person?

  • Is the Scaffold Category 1 or Category 2?

  • Is there a design drawing available for the scaffold?

3.11 Excavations

  • Are Excavation works being undertaken on this project?

  • Describe the Excavation works taking place:

  • Is the safe system of work being followed for the Excavations?

  • Are the Excavations being inspected daily by a competent person?

  • Are Excavations adequately supported to avoid collapse?

4.0 Health & Safety File

  • Have arrangements for the collation and distribution of the H&S File been established?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.