Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Contact details

  • Address of site:
  • Address of customer
  • Date:

  • Client name

  • Client email

  • Client phone numbers

Survey

  • Working times

  • Power

  • Storage and mix area

  • Water supply

  • 3 phase power

  • Level survey required ?

  • Lighting

  • Damp reading

  • Waste requirement

  • Schmitt hammer test required

  • Skips required

  • What is the existing covering ?

  • Asbestos

  • Existing floor coverings

  • Preparation required

  • Material recommendation

  • Measures

  • General shape

Labour requirement

  • Day 1

  • Day 2

  • Day 3

  • Day 4

  • Day 5

  • Day 6

  • Day 7

  • Day 8

Special labour requirements, I.e. Pump, screeders, MMA

Plant and consumables aside from van stock

  • Cretangle

  • Fr200 planer

  • STR

  • Large site box

  • Electric fan with hose

  • 240 leads

  • Large floor saw

  • Electric heater / red rad

  • 10 KVA transformer

  • 3 phase leads

  • Gas bottle

  • Cordless drill

  • Pallet truck

  • Tile lifter

  • Water butt

  • Hose pipe

  • Wet vacuum

Any other information

  • Any site photos.

  • Any other info

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.