Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Contact details
-
When does the quote need to be back for ?
-
Address of site:
-
Address of customer
-
Date:
-
Client name
-
Client email
-
Client phone numbers
Survey
-
What is the area being used for
-
What chemicals are being used
-
Is there any airborne silicone in the working area.
-
Is there a slip resistance requirement. PTV 36 in the wet ?
-
Working times
-
Power
-
Storage and mix area
-
Water supply
-
3 phase power
-
Level survey required ?
-
Lighting
-
Damp reading
-
What is the reading
-
Waste requirement
-
Schmitt hammer test required
-
What is the existing covering ?
-
Asbestos
-
Existing floor coverings
-
Preparation required
- grind
- blast
- plane
- hand grind
- degrease
- break out
- terminator
- cut
- 3 phase grinder
- Tile lifter
- Cut chases 10 x 10
-
Material recommendation
Area 1
-
Area reference
-
Underlay Floor area Joints Cove & Cove trim requirements
-
General shape
-
Material recommendation
Area 2
-
Area reference
-
Underlay Floor area Cove lm & cove trim requirements Joints
-
General shape
-
Material recommendation
Area 3
-
Area reference
-
Underlay Floor area Cove lm & cove trim requirements Joints
-
General shape
-
Material recommendation
Area 4
-
Area reference
-
Underlay Floor area Cove lm & cove trim requirements Joints
-
General shape
-
Material recommendation
Labour requirement
-
Day 1
-
Day 2
-
Day 3
-
Day 4
-
Day 5
-
Day 6
-
Day 7
Special labour requirements, I.e. Pump, screeders, MMA
Plant and consumables aside from van stock
-
Cretangle
-
Fr200 planer
-
STR
-
Large site box
-
Electric fan with hose
-
240 leads
-
Large floor saw
-
Electric heater / red rad
-
10 KVA transformer
-
3 phase leads
-
Gas bottle
-
Cordless drill
-
Pallet truck
-
Water butt
-
Hose pipe
-
Wet vacuum
Any other information
-
Any site photos.
-
Any other info
Drains
-
What are the drain requirements and drain measures and sizes.
-
What pipe work is required and also width, stainless or pot ?
-
What gullies are required
-
Weight requirements
Untitled page