Title Page
-
WIP AUDIT- ROTHWELL plumbing services LTD
-
Client / Site address
-
ENGINEER
-
Van registration
-
Completed on
-
INSPECTOR
-
Job description
-
Location
CONSTRUCTION PHASE PLAN
-
Site Specific Risk Assessment on Site
-
Add media
-
Asbestos Survey on site and completed
-
Add media
-
Is the engineer aware of the process when a ACM is found
-
COSHH booklet on site
-
Technical survey form on site
-
Add media
-
Ladder check sheet completed
-
Add media
-
Work equipment sheet completed
-
Add media
-
Does engineer possess a waste carriers license
-
Add media
-
Data protection compliance form completed
-
Engineer aware of accident reporting process
SITE
-
Customers aware of any hazards during the installation and what control measures are in place to protect them
-
Did the customer receive prior warning regarding potential noise/disruption
-
Do the installers have access to welfare facilities on site
-
Have any works in confined space been identified and control measures enforced
-
Did the engineer recognise any potential environmental hazards including pets,wildlife and plant life
GENERAL SITE CONDITIONS
-
Cleanliness,tideness,obstacles have control measures in place
-
Is the engineer working in a safe and considering manner
-
Are there clear access routes to all the work areas including to and from van
GENERAL HOUSEKEEPING
-
Tools and equipment kept tidy
-
Add media
-
Access and egress outed clear
-
Signage,barriers and floor protection in place
-
Add media
ENGINEERS EQUIPMENT
-
RCD being used
-
All electrical equipment PAT tested
-
Flue gas analyser available and calibrated
-
General condition of hand tools good
FIRE CONTROLS
-
Is there a fire extinguisher on site
-
Is the fire extinguisher pressurised,in date and labelled
-
Add media
-
Is the engineer using a heat mat
MANUAL HANDLING
-
Handling of items such as boilers,2 man lift considered
-
Add media
-
Any mechanical aids required
-
If mechanical AIDS required, they have they been provided
WORKING AT HEIGHT
-
Should scaffold have been used
-
If scaffolding used has it been taged
-
All ladders labelled and inspection log completed on ladder tags
-
Have ladder checks been completed
-
Are the ladders in good and safe condition
-
Safe ladder access including positioning and pedestrians safety
-
Are ladders tied off
-
Has tetra kit been used
-
Has tetra kit been logged in either ladder check list or equipment check list sheet
FIRST AID PROVISIONS
-
Is a fully stocked first kit available including 5 eye wash applications and are they in date
-
Does the engineer have a complete set of PPE including<br>Protective footwear<br>Eye protection <br>Ear protection <br>Dust mask<br>Hard hat
-
Is the engineer using PPE provided
-
Does the engineer have a basic understanding of SHE requirements
VEHICLE
-
Is the vehicle parked with consideration to other road users and pedestrians using footpaths
-
Is the vehicle in a good condition with the vehicle check list up to date
INSTALLATION COMPLIANCE
QUALITY ASPECTS
-
Boiler installed to manufactures instructions
-
Are all the work areas kept in a safe manner ,including routes and trip hazards
-
Are all floor coverings and work tops protected where required
-
Add media
-
-
Is all waste placed safely in a segregated area and corned off
-
Add media
-
Has the waste water from central heating been drained off to a foul drain and provide evidence of where the heating system as been drained off to
-
Add media
-
Does the engineer have a suitable method of spill containment
-
Have the engineers addressed their duty of care to visually inspect all gas appliances
SIGN OFF
-
Review of audit
-
Agreed improvements to be made
-
Engineer
-
Supervisor