Information
-
Job # & Site Name
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1 - Emergency Procedures
-
1.1 - Is the site ERP posted for workers to see?
-
1.2 - Is there an evacuation plan and Muster point identified?
-
1.3 - Are emergency personnel identified?
-
1.4 - Have procedures been tested?
2- Site Signage
-
2.1 - Is the appropriate company signage in place?
-
2.2 - Are company PPE signs posted?
-
2.3 - Is the Muster point sign in the right location?
3 - Emergency Equipment / First Aid
-
3.1 - Are air horns located on site?
-
3.2 - Have fire extinguishers been checked within the last 30 days? (is there an inventoried inspection log and are cards initialed)
-
3.3 - Are extinguishers within annual inspection dates by a certified individual?
-
3.4 - Is there a list of First Aiders on site?
-
3.5 - Are First Aid supply levels correct?
-
3.6 - Are there blank first aid records located in the first aid cabinet?
4 - MSDS on Site Chemicals
-
4.1 - Are Material Safety Data Sheets available for all chemicals?
-
4.2 - Are all containers labeled correctly? (suppliers label / workplace label)
-
4.3 - Is additional PPE available?
-
4.4 - Are eye wash stations easily accessed?
5 - Task Hazard Assessment
-
5.1 - Have appropriate task hazard assessments been written?
-
5.2 - Have the appropriate hazards and controls been identified?
-
5.3 - Have possible Safe Work Procedures been referenced?
-
5.4 - Have Task Hazard Assessments been reviewed/updated/rewritten as work progresses?
6 - Site Documentation: Inspections, Toolbox Talks, Permits and Plans
-
6.1 - Is the sites previous inspection posted for workers to review?
-
6.2 - Is the previous site Toolbox talk posted for workers to review?
-
6.3 - Are required Hot Work permits in place?
-
6.4 - Are required safe work plans written for site specific tasks?
-
6.5 - Is the sites weekly safety paperwork being sent into the main office for review and meeting set out requirments?
7 - Site Personnel
-
7.1 - Are workers orientated to site and can they be identified?
-
7.2 - Are workers suitably trained? (WHIMS, CSTS, Lift and Fall Protection, Equipment Operation/Specialized Training)
-
7.3 - Have workers signed in at the start of their shift?
-
7.4 - Are workers conducting their tasks safely?
8 - Near-miss / Incident Reporting
-
8.1 - Is the SITR system being promoted on site?
-
8.2 - Have any events been reported?
-
8.2a - Have effective controls been developed as a result?
-
8.2b - Has the Chandos safety department been notified?
9 - PPE and the Worker
-
9.1 - Is the proper PPE in place?
-
9.2 - Has the PPE been inspected and is it being worn properly?
-
9.3 - Are workers certified for specialized PPE in use?
10 - Signs and Barricades
-
10.1 - Are danger zones identified?
-
10.2 - Are proper barricades in place?
-
10.3 - Are barricades secure and monitored?
11 - The Work Area
-
11.1 - Is the job site neat and organized?
-
11.2 - Is the site free of Slips / Trips / Falls
-
11.3 - Is there adequate amount of lighting for the work being conducted.
-
11.4 - Is rebar on site protected properly on site? (horizontal - mushroom caps / Vertical - flat safety cap or rail system)
-
11.5 - Is there a safe location for workers to take a break?
-
11.6 - Are site facility's clean and acceptable for use?
12 - The Work Environment
-
12.1 - Are issues concerning Dust / Mist / Fumes properly dealt with on site?
-
12.2 - Are noise levels acceptable?
-
12.3 - Is there a Material Storage area identified?
-
12.4 - Are items that present a Spill, Compressed Gas or Flammable hazard stored properly?
-
12.5 - Is the appropriate safety items in place should an issue arise? (spill kit, wash station, absorbent booms or materials)
-
12.6 - Is there an appropriate amount of ventilation for heaters?
13 - Lockout / Tag Out
-
13.1 - Are there tags available should an item need to be removed form service?
-
13.2 - Is the system being followed? (items tagged and information provided on the tag)
-
13.3 - Are items removed from site for repair by a certified individual?
14 - Site Electrical
-
14.1 - Are electrical panels properly placed, labeled and secured for lock out purposes?
-
14.2 - Do circuits include a GFI breakers?
-
14.3 - Are all extension cords run neatly with the ends kept away from water hazards?
-
14.4 - Are extension cords in good condition with proper ends including ground pin?
15 - Hand and Power Tools
-
15.1 - Are hand tools inspected and ready for use?
-
15.2 - Are all safe guards in place when used?
-
15.3 - Are tools being used properly?
-
15.4 - Are tools being stored properly?
16 - Heavy Equipment
-
16.0 - Is there heavy equipment in use on site?
-
16.1 - Has the heavy equipment been inspected?
-
16.2 - Is a certified operator using the heavy equipment?
-
16.3 - Is the heavy equipment being used properly?
-
16.4 - Do other workers conduct there task in conjunction with heavy equipment in the area properly?
17 - Cranes / Hoisting / Overhead Hazards
-
17.0 - Are there any Hoisting / Overhead Hazards / Cranes on site?
-
17.1 - Has a documented crane and rigging inspection been filed prior to any lift being started?
-
17.2 - Has a lift plan been created and approved?
-
17.3 - Are loads being checked prior to being moved?
-
17.4 - Is the area below an overhead hazard marked out and a control zone established.
-
17.5 - Are all workers staying clear of the any possible drop zone for an overhead load or hazard?
18 - Fall Protection
-
18.1 - Is the need for fall protection being addressed on site?
-
18.2 - Are fall protection plans in place for all workers conducting their task in an aerial situation?
-
18.3 - Are adequate rescue plans in place as per the fall protection plan?
-
18.4 - Are workers certified for the use of fall protection gear such as a harness, lanyard or life line?
19 - Aerial Platforms
-
19.0 - Are there any aerial platforms in use?
-
19.1 - Have aerial platforms been inspected and is this documented?
-
19.2 - Are all safety mechanisms in place for proper use? (safety chain/fall protection/equipment operation)
-
19.3 - Are aerial platforms are being operated as intended?
20 - Scaffolding
-
20.0 - Are there any scaffolding systems in use?
-
20.1 - Are scaffolding systems tagged and within inspection dates?
-
20.2 - All components are being use? (base, cross brace, pins, brackets, toe boards, midrail, guardrail, ladder, anchors)
-
20.3 - Workers are utilizing scaffold correctly?
21 - Ladders
-
21.0 - Are there any ladders in use on site?
-
21.1 - Ladders on site are rated for construction use? (type 1 or 1a)
-
21.2 - Ladders are properly braced, anchored and extend 1 meter past point of exit?
-
21.3 - Workers are using ladders properly on site?
22 - Trenching & Excavations
-
22.0 - Are there any trenching or excavation activities being carried out on site?
-
22.1 - A valid First Call is in place prior to any digging taking place.
-
22.2 - All underground hazards are marked out with site signage and protected.
-
22.3 - Proper excavation techniques are followed when digging around any underground line. (hand expose / hydrovac)
-
22.4 - Are proper controls for cut back(slope), shoring and ventilation in place?
-
22.5 - Established access and egress in place.
-
22.6 - Are adequate barricades in place to identify location of open trenches?
-
22.7 - Are control measures in place to protect the public from danger?
23 - Confined Space
-
23.0 - Is there any confined space requirements or issues on site?
-
23.1 - Has a valid rescue plan been developed and in place?
-
23.2 - Are certified workers conducting tasks in this space?
-
23.4 - Is there proper ventilation and atmospheric testing in place?
-
23.3 - Is the proper monitoring system in place both in and outside the confined space?
-
23.5 - Is the site secured from the public and other workers?
Inspection Comments:
-
Corrective actions to be completed:
-
Select date
-
Add signature
-
Add signature
-
Add signature