Title Page
-
Faculty/Line Segment
-
Conducted on
-
Prepared by
-
Location
-
Check all boxes that apply.
This Report covers: -
Permanent Repairs (sections A, B & E)
-
Test Point Installation (sections A, B & E)
-
Visual Pipe Inspection (sections A, B & E)
-
Stations (sections A & D)
-
Valves (sections A & D)
-
Exposures (section A & C)
-
DOT
- Yes
- No
-
Date of Report
-
Date Completed
-
Report #
-
Line Segment/Description
-
Township/Legals
-
LAT/LONG
-
County/State
-
Type of Service
- Gas
- Crude
- CO2
-
Line Size
-
Final Line Depth
Section A: Coating and Pipe Condition
-
Condition of Pipe and Coating
- Generally Corroded
- Isolated Pitting
- No Corrosion
- Bonded
-
Paint Condition
- Ok
- Requires Painting
-
Pipe-to-Soil Transistion
-
Coating Applied
- Yes
- No
-
Condition of Coating
- Good
- Poor
- Brittle
- Wrinkled
- Soil Penetration
- Cracked
-
If the line was cut, what was the condition of the internal surface?
- Generally Corroded
- Isolated Pitting
- No Corrosion
- Bonded
-
Type of Existing Coating
- Asphalt
- Coal Tar
- Epoxy
- Plastic Tape
- ACM
- None
- Other
-
If "other" please explain
-
Type of Coating Applied
- Asphalt
- Coal Tar
- Epoxy
- Plastic Tape
- ACM
- None
- Other
-
If "other" please explain
Section B: Corrosion
-
SCC Performed
- Yes
- No
-
Catholic Protection
- Anode
- Rectifier
- None
-
Maximum Pit Depth
-
Length of Longest Pit
-
Longitudinal/Axis Length
-
If there is internal corrosion, how much wall lose?
-
Damage to Company Pipeline?
- Yes
- No
-
Date of Spill Report
-
Hydro Test Report
Section C: Washouts and Erosion
-
Nature/Reason for Exposure
-
Length of Exposure
-
Is Exposure Increasing?
- Yes
- No
-
Is Pipe Suspended?
- Yes
- No
-
If "yes" please state length suspended
-
Is Exposure in Waterway?
- Yes
- No
-
If "yes" please state the waterway's name
-
Is Exposure in High Impact Area?
- Yes
- No
-
If "yes" please describe
-
Exposed Coating Condition
- Ok
- Damaged
- Disbonded
- Other
-
If "other" please explain
Section D: Pipe Supports
-
General Condition of Pipes
- Ok
- Requires Repair
-
Type of Support
-
Problem Location
-
Insulation
- FRP
- None
-
FRP Condition
- Ok
- Other
-
If "other" please explain
Section E: Soil Conditions
-
Soil Type
- Clay
- Loam
- Rock
- Sand
- Silt
- Other
-
If "other" please explain
-
Drainage
- Good
- Fair
- Poor
-
Land Use
- Cultivated
- Pasture
- Wooded
- Other
-
If "other" please explain
-
Backfill
- Loose
- Settling
- Solid
- Other
-
If "other" please explain
-
Topography
- Level
- Rolling
- Rough
- River Bottom
- Swampy
- Other
-
If "other" please explain
-
Tests
- Wet
- Dry
-
Pipe/CuSO4
-
Over Pipe
-
Under Pipe
-
Ground Level
-
Soil PH
-
At Pipe Level
-
Remarks:
-
Picture(s)
-
Employee Signature
-
Date
-
Supervisor Review Signature
-
Date