Title Page

  • Facility/Line Segment

  • Conducted on

  • Prepared by

  • Location
  • Chaparral Instructions:

    Production and/or other field personnel must provide all information in Parts 1-6 to the Pipeline Compliance Department.

    The Pipeline Compliance Department will report this info to DOT or a required State agency.

  • Chaparral Energy
    701 Cedar Lake Blvd.
    OKC, OK. 73114
    405-426-4476

  • Date

Part 1

  • Date Discovered

  • Milepost/Stake #

  • County

  • Location

  • City, State

  • Product Transported

Part 2

  • Determined unsafe by: (include date determined and title if applicable)

Part 3: Type of Condition

  • General Corrision

  • Unintended Movement or Abnormal Loading

  • Equipment Malfunction

  • Leak

  • Localized Corrosion

  • Material Defect or Physical Damage

  • Operator Error

  • Other

  • If "other", please explain

  • Comments

Part 4

  • Conditions Leading to Discovery:

Part 5

  • Corrective Action Taken

Part 6

  • Future Action: (include schedule to start and finish)

Part 7

  • Signature

  • Supervisors review

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.