Title Page
-
Facility/Line Segment
-
Conducted on
-
Prepared by
-
Location
-
Chaparral Instructions:
Production and/or other field personnel must provide all information in Parts 1-6 to the Pipeline Compliance Department.
The Pipeline Compliance Department will report this info to DOT or a required State agency. -
Chaparral Energy
701 Cedar Lake Blvd.
OKC, OK. 73114
405-426-4476 -
Date
Part 1
-
Date Discovered
-
Milepost/Stake #
-
County
-
Location
-
City, State
-
Product Transported
Part 2
-
Determined unsafe by: (include date determined and title if applicable)
Part 3: Type of Condition
-
General Corrision
-
Unintended Movement or Abnormal Loading
-
Equipment Malfunction
-
Leak
-
Localized Corrosion
-
Material Defect or Physical Damage
-
Operator Error
-
Other
-
If "other", please explain
-
Comments
Part 4
-
Conditions Leading to Discovery:
Part 5
-
Corrective Action Taken
Part 6
-
Future Action: (include schedule to start and finish)
Part 7
-
Signature
-
Supervisors review