Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Split AC
-
Check the thermostat
-
Check all electrical terminals
-
Check the control panel
PPE
-
Employee wearing ppe
-
Check the duct insulation
-
-
PPM Carried out and per plan
Irrigation pump
-
Check the thermostat
-
Check pipe insultaion
-
Check motor vibration
-
PPM Carried out and per plan
Booster pump
-
Check the thermostat
-
Check pipe insulation
-
Check motor vibration
-
PPM Carried out and per plan
Transfer pump
-
Check the thermostat
-
Check pipe insulation
-
Check motor vibration
-
PPM Carried out and per plan
Technical rooms
-
Check all power indicators
-
Check all contacts free from carbon
-
Check the panel exhaust
-
PPM Carried out for equipment and per plan
Toilets
-
Check WC flush sensor
-
Check the lights (inside)
-
Check the Wc and flow trap if free from block
Meter reading
-
Check all electrical meter reading
-
Check all domestic water meter reading
-
Check all irrigation water meter reading
Fire alarm panel
-
Check smoke detectors
-
Check heat detectors
-
Check main panel Troubles and Faults <br>(Report if any)
-
Regular Service and Maintenance carried out for FACP
Exhaust fan
-
Check power isolator
-
Check the fan
-
Check the motor vibration
-
PPM Carried out and per plan