Title Page
-
Swings inspected
-
Conducted on
-
Prepared by
-
Location
Scaffold Rig
-
Counter weights are secured
-
Tie backs are secured to structure or engineered anchorage point
-
Wire mesh and debris tray netting are intact and free of debris
-
Emergency decent function is operational
-
Crew members are properly trained
-
Crew in swing is equipped with a radio for communication with groundman
Fall Protection
-
Retractables, lifelines, and rope grabs are in good condition with out defects
-
Are secured to structure or engineered anchorage point
-
Edge protection is implemented on all sharp edges
-
Lifelines are tied with a bowline knot or termination bar
-
Guardrails, warning lines, or PFAS are in place at all leading edges
Tools & Materials
-
All tools are tethered and secured to worker or basket
-
All materials are tethered before they are permanently fastened to the building
-
All small loose items are stored & secured within a zipped canvas bag and tethered
-
All materials/tools are tethered before they are transferred between the roof and swing basket
CAZ
-
CAZ is established around affected area
-
CAZ consists of hard barriers (NO CAUTION TAPE)
-
Appropriate signage is posted
-
Groundman is present
-
Groundman is equipped with a radio for communication with swing crew
Documentation
-
Daily suspended scaffold log book is completed
-
Swing specific PTP has been conducted, reviewed, and signed off by crew