Title Page

  • Technicians name

  • Company

  • Chorus ID

  • Spark ID

  • Conducted on

  • Location
  • Photo of tech

  • Photo of IDs

  • Passport holds all stamps required for role and none are expired

  • Tech has correctly identified exchange hazards

  • Tech has correctly described exchange access rules and procedures

  • jumper lead lengths to use<br>1 rack 5m. 2 - 3 racks 8m. 4 - 6 racks 12m. >6 racks 15m. <br>5m and 8m must be identified to pass.

  • Correctly identified splitter port

  • Correctly identified Shelf, Tray and Port

  • Jumper routing<br>No loops, correct routing, laying flat in trough, adequate slack to allow draw to move freely

  • Data card filled out correctly at both ends of jumper

  • Photo of demonstration jumpering performed by tech

  • IBYC procedure

  • Tech knows the correct procedure if their splitter or ports are already in use

  • Tech knows under which circumstances they are allowed to unplug a fibre<br>(If proven beyond a doubt it is a non working fibre)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.