Title Page

  • SO No.

  • Chorus ID

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Photo(s) of FTP and duct, with splice tray out to show internal cable entry. 1.2m of each fibre if splicing, or 2m if no splice. Silicone or co-polymer sealant on house penetration.

  • Photo(s) of ETP Showing wiring integration & linking cable if used.

  • What method of integration was used?

  • Photo(s) of ITP, ONT showing: Terminated integration wiring in the ITP. 300mm measure off the floor. Clean finished install.

  • Photo of your FIP inspection of the ONT SC/A connector.

  • Photo of Flash9 SC tray, or of LC/A FIP inspection at cabinet or OFDC 1.2m of ABFU on tray with 1m of sheath and acrylite removed. Fibres managed correctly & splice protector in correct comb position with metal bar upwards.

  • Techmate test ID with all 3 tests performed.

  • Photos of build pathway and anything else of interest.

  • Notes on the install, any problems encountered and how they were solved.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.