Information
-
Document No.
-
Date
-
Audit Title
-
Service Company. Version
-
Contractor
-
Completed by
-
Location
-
FFP#
-
WAP#
-
B4UDIG sighted
-
Onsite Supervisor
-
Brief description of works at time of inspection
General
General
-
Are Chorus signs displayed for community where applicable?
-
Are all the people on the worksite wearing compliant PPE. Hard hat, safety boots, hi viz vest, safety eye wear, long pants, long sleeved shirt?
-
Are you requested to sign on to a daily prestart / JSA. Are hazard controls discussed?
-
Coloured A3 plans on site?
-
Is the supervisor controlling critical activities experienced?
-
Work activity photo
-
Work activity photo
-
Work activity photo
-
Work activity photo
-
Work activity photo
-
Work activity photo
-
Work activity photo
-
Work activity photo
Working at height
Working at height
-
Is the site activity involved in working at heights e.g. aerial pole work?
-
Are persons trained? Must sight tickets.
-
Are fall hazards identified and controls in place?
-
Photo of controls
-
Harnesses, lanyards and other fall arrest equipment been inspected prior to works commencing?
-
Are guards, rails or barriers in place?
-
An exclusion zone set up?
-
Is there a permit in place for works over 5 metres?
-
For pole work has the pole been tested?
-
Is there a rescue plan in place and adequate rescue equipment readily accessible on site?
-
Comments
Excavation and Drilling
Excavation and Drilling
-
Are excavation or drilling activities taking place on the site?
Tap to enter information
-
Excavation and drilling permit completed and available.
Tap to enter information
-
If there is no permit in place then all work on the site should be stopped until a permit is in place. This should be recorded in the comments of the audit.
-
Is the permit for the current location?
Tap to enter information
-
If there is no permit in place then all work on the site should be stopped until a permit is in place. This should be recorded in the comments of the audit.
-
Close approach permit is in place if plant or people are working within 3 metres of overhead cables?
Tap to enter information
-
If there is no permit in place then all work on the site should be stopped until a permit is in place. This should be recorded in the comments of the audit.
-
Have all current proximity permits been obtained from utility owners?
Tap to enter information
-
If there is no permit in place then all work on the site should be stopped until a permit is in place. This should be recorded in the comments of the audit.
-
Only techniques approved on the permits being used?
Tap to enter information
-
If the site methods do not match the permit in place then all work on the site should be stopped until clarification of the methods is discussed. This should be recorded in the comments of the audit.
-
Are service mark outs visible?
-
Excavations deeper than 1.5 metres have been notified to Worksafe NZ?
Tap to enter information
-
If no notification is in place then all work on the site should be stopped until notification has been made. This should be recorded in the comments of the audit.
-
Are trenches greater than 1.5 metres deep, battered, benched or supported?
Tap to enter information
-
If there are not trench supports in place then all work on the site should be stopped until measures have been agreed and implemented to support the trench. This should be recorded in the comments of the audit.
-
Has a services spotter been allocated to each excavator?
-
Comments
Traffic Management
Traffic Management
-
Does the activity being carried out require traffic or pedestrian management?
Tap to enter information
-
Is there a copy of the current traffic management plan on site?
-
Traffic management set up is correct according to the approved traffic management plan?
-
Is there an escape route for the traffic contoller?
-
Is the STMS contact number listed?
-
Is there and after hours traffic management plan in place?
-
Are the cones and barriers being used in good condition?
-
PPE selected, used and suitable for the activity and environmental hazards present?
-
Are unattended excavations backfilled, plated or fenced?
-
Is the worksite (including footpaths and roads) clear and free from debris, rubbish and obstructions?
-
Comments
Plant and Equipment
Plant and Equipment (including mobile plant)
-
Are vehicles or mobile plant present on the worksite?
Tap to enter information
-
Has a daily plant prestart been documented by the operator prior to operating the machine?
-
Are site vehicles parked safely? e.g. on a decline
-
If work vehicles are parked on a hill are wheels chocked, handbrake engaged etc?
-
WOF/COF/RUC/Registration current on all vehicles?
-
Drivers and operators have the correct vehicle licences and endorsements? e.g. WTR
-
Drivers and operators are wearing seatbelts on moving vehicles?
-
Ares safe reversing procedures being followed?
-
Comments
Public Safety and Pedestrian Access
Public Safety and Pedestrian Access
-
Does the site activity effect pedestrians movement or expose the general public to risk?
Tap to enter information
-
Is safe pedestrian access maintained around the work area?
-
Are all trenches and pits cordoned off?
-
Are appropriate barriers in place?
-
All manholes and pits are barriered or covered?
-
Does the pedestrian route cater for people with disabilities and children?
-
Mobile plant and machinery operations are segregated for the pedestrian routes?
-
Ramps are compliant with pedestrian route requirements?
-
Comments
Confined Spaces
Confined Spaces
-
Does the activity require access to confined spaces?
Tap to enter information
-
Is there a confined space management plan on site
-
Is there a trained confined space supervisor on site?
-
Are confined space permits in use?
-
Is there a standby person outside the confined space at all times the confined space is occupied?
-
Is there an emergency response plan detailed and available on the site?
-
Is certified emergency rescue equipment available?
-
Was atmospheric testing completed before each entry to the confined space?
-
Is continuous atmospheric testing in place at all times the confined space is occupied?
-
Does the atmospheric testing equipment have a current certification?
-
Comments
Environmental Management
Environmental Management
-
Site specific tree plan on site and signed off by the local authority?
-
Spill response plan available and understood?
-
Spoil containment and removal (including stockpiles) managed?
-
Is any stored backfill located more than 500mm from environmentally sensitive areas? (drains, streams, dumps leading to stormwater pits)
-
Is all back fill stored on top of drop sheets?
-
Are fibre off cuts and ribbonet cut offs collected for recycling?
-
Are safety fences secured with cable ties? (string / wire not acceptable )
-
Dust and noise on site is mnimised or eliminated?
-
Comments
Hazardous Substance Management
-
Is there a hazardous substance register held on site?
-
Are SDS available onsite for each hazardous substance?
Tap to enter information
-
Are the SDS dated within the last 5 years?
-
Comments
Critical Safety Checks
Critical Safety Checks
-
If any of the following safety critical areas are not compliant then work at the site should be postponed / ceased until the area of concern is addressed
-
Permits / consents of work not in place e.g. working at heights, excavation / drilling, confined space work
-
No qualified STMS on site (LV2) - Pedestrian safety at risk
-
Breech of Safe work methods statement (SWMS)
-
Unsafe behaviour where potential to injure a person e.g. working at height with no fall protection in place, not trained.
-
Comments
-
Worksite photo
-
Worksite photo
-
Worksite photo
-
Worksite photo
-
Worksite photo
-
Worksite photo
Sign Off
-
Site Representative
-
Tap to enter information
-
Chorus Representative
-
Tap to enter information
-
Positive behaviours
-
Any other comments?