Title Page
-
Conducted on
-
Prepared by
-
Location
Untitled Page
General Site Assessment
-
Has the site been identified for the circuit extension project?
-
Please provide details on any obstacles or challenges identified on site.
-
How many additional circuits are required for the extension?
-
Are there any safety hazards that need to be addressed before starting the extension project?
-
What level is the client’s IT closet located?
-
Where is the MPOE located?
DIA Circuit Survey
-
Is the circuit extended to the client suite?
-
If the circuit is not extended, what is the distance between MPOE and the client’s IT closet?
-
Is NID installed at MPOE?
-
Is Fiber NID installed at the client’s IT closet?
-
Is SFP inserted in fiber NID?
-
How many days will it take to install the circuit from MPOE to client IT closet?
-
What type of fiber is required to complete the circuit extension project (Multi- mode or Single mode)?
-
Take clear photos of the MPOE, fiber panel, and NID, ensuring circuit ID is visible.
-
Take clear photos of the IT room and fiber route for installation.
-
What ground level is Chanel IT room is located?
-
What ground level is MPOE located?
Broadband Circuit Survey
-
Is the broadband circuit located at MPOE?
-
Is the broadband circuit extended to the client’s IT closet?
-
If extended, take photos showing circuit ID, MAC address, and IP address on the router.
-
Verify cable route for broadband circuit extension.
-
Identify broadband type (DSL, Fiber, Cable).